Log in
Forum » NC-2009 WEc2
Topic

Rainwater Harvesting Tank Calculations

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Erin Holdenried on Jul 5, 2011, 4:13 pm

Has anyone found a good spreadsheet/website that calculates the approximate size of a rainwater tank needed for a given...

Last reply: Andres Schwarz, May 12, 2022, 3:31 pm

Innovative Waste water technologies

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Swati Taywade on Feb 24, 2020, 1:49 am

If a project treats 100% wastewater and reuses it for irrigation except the treatment in done through local govt utilities service provider, can the project claim point under Innovative Waste...

Credit for using rainwater towards truck washing

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Pournamasi Rath on Nov 15, 2017, 1:42 pm

We are working on a large scale City Garage project targeting LEED Silver certification. We are considering...

Last reply: Alana Cristante, Apr 18, 2019, 11:25 am

Condensate to a campus grey water system instead of being used on-site

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Bo White on Jan 9, 2019, 2:16 pm

Our building is on a college campus and we plan to route all condensate to the campus grey water system. Does this qualify even though it is not being used on-site? Also, does condensate need to...

Confirm the percentage of wastewater treated on-site definition

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Jing Hong on May 9, 2017, 12:33 pm

Trying to confirm couple of terms in WEc2, yes or no questions:
1. The Percentage of wastewater treated on-site = (Total average annual quantity treated on-site ) / (Total calculated flush...

Last reply: Tristan Roberts, Aug 26, 2017, 5:59 pm

WEc2: Time frame for functional reclaimed water systems

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Brian Bartholomew on Jun 6, 2017, 5:03 pm

Under the Bird's Eye View here for WEc2, there is a citation of...

Last reply: Tristan Roberts, Aug 26, 2017, 5:52 pm

Treated Waste Water Re-use for a Campus site

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Ashwin Kumar on May 15, 2014, 7:13 am

Hello,
We have a Manufacturing Facility project registered under a Campus registration having a common STP for treating all the of the Campus Waste-water.

This is allowed According...

Last reply: Ashwin Kumar, May 25, 2016, 7:23 am

Is groundwater ok for Wec2?

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Alexander Marquez on Aug 5, 2014, 10:13 am

There is a non-potable aquifer under the building's basement. Can we install a well to extract this water and use it for irrigation and flush the toilets? This would reduce the quantity needed of...

Last reply: Tristan Roberts, Nov 27, 2015, 3:11 pm

On-site waste water treatment in LEED V4

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Lorne Mlotek on Dec 1, 2014, 10:23 am

Are Lagoons, or septic tanks rewarded at all in LEED V4?

This credit was omitted from the new version and I am curious if I installed an on-site waste water treatment facility onsite which...

Last reply: Tristan Roberts, Nov 27, 2015, 3:01 pm

Water Efficiency Calculation

NC-2009 WEc2: Innovative Wastewater Technologies
posted by ABDUL MUTHALIB MOHAMED on Dec 19, 2014, 8:07 am

Hi,
My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used? Can we give flow rate as 0 and...

Last reply: Tristan Roberts, Nov 27, 2015, 2:36 pm