Log in
Forum » NC-2009 SSc5.2
Topic

Establishing the LEED Project Boundary

NC-2009 SSc5.2: Site development - maximize open space
posted by Robert Mulcahy on Jul 11, 2011, 3:28 pm

I’m trying to confirm the LEED Project Boundary. Normally, the LEED Project Boundary for a single building development would be the same as the site boundary. However, the construction of our...

Last reply: Manny Iglesia, Dec 19, 2011, 3:24 pm

Tennis Court use for meeting SSc5.2 Maximize Open Space

NC-2009 SSc5.2: Site development - maximize open space
posted by JOHN COOK on Jul 15, 2011, 11:41 am

Can we count count our Tennis courts - that are part of the project boundary towards our Space requirement in Case 2? The courts are hardscaped.

Last reply: Manny Iglesia, Dec 19, 2011, 3:17 pm

Definition of Site Area?

NC-2009 SSc5.2: Site development - maximize open space
posted by Ellen Mitchell on Apr 11, 2011, 4:06 pm

This may be a dumb question, but I have a project that falls under Case 3 - provide vegetated open space equal to 20% of the project's site area. I can't find any credit language that says...

Last reply: Manny Iglesia, Dec 15, 2011, 2:08 pm

Reflecting Pool

NC-2009 SSc5.2: Site development - maximize open space
posted by Rosana Correa on May 9, 2011, 2:08 pm

Hello everyone!

Will areas covered with reflecting pools count as open space areas?

Thanks!

Last reply: Manny Iglesia, Dec 15, 2011, 1:56 pm

Open Space Requirement

NC-2009 SSc5.2: Site development - maximize open space
posted by Elliot Powers, LEED AP BD+C on Oct 27, 2011, 11:56 pm

Count me in with those frustrated with this credit language/ requirements. So I can be confident of our calcs, the local requirements call for vegetated open space to equal 25% of the total...

Last reply: Manny Iglesia, Dec 7, 2011, 1:32 pm

Dedicated Open Space separate from the project site

NC-2009 SSc5.2: Site development - maximize open space
posted by Laurie Hammack on Oct 21, 2010, 12:42 pm

Our project is in a previously developed urban site and we do not have an opportunity on the project site to provide the percentage of open space required.

Our project is for a department...

Last reply: Renee Shirey, Dec 5, 2011, 10:58 am

Code defines Maximum Open Space

NC-2009 SSc5.2: Site development - maximize open space
posted by Daniel Hartsig on Jun 3, 2011, 10:30 am

Hello Everyone-

I'm currently working on a project where the local code defines no minimum amount of open space. Instead, they define a maximum amount of open space (at 19% of site area...

Last reply: Elliot Powers, LEED AP BD+C, Nov 9, 2011, 7:26 pm

zoning requirement split 30% and 95%

NC-2009 SSc5.2: Site development - maximize open space
posted by Edwin Wealend on Jun 8, 2011, 10:02 am

Hi we have a site whereby our LEED boundary includes two separately zoned areas and one is zoned for buildings with 30% open space required by local planners. The second space equivalent to the...

Last reply: Devon Bertram, Oct 24, 2011, 5:14 pm

Roof Terraces and Balconies

NC-2009 SSc5.2: Site development - maximize open space
posted by Catalina A on Jul 29, 2011, 5:35 pm

We are certifying a Hotel Project earning credit SSc2. The Hotel has two open space restaurants located in the first floor and two terraces with vegetation and a pool accessible to everyone in...

Last reply: Devon Bertram, Oct 21, 2011, 7:02 pm

Ground depth beneath vegetated area

NC-2009 SSc5.2: Site development - maximize open space
posted by Valentin Grimaud on Aug 3, 2011, 5:22 am

Hi everyone!

I have a very specific question regarding vegetated area. Should the earth depth under the vegetated area be of a minimum thickness in order to be considered as vegetated area...

Last reply: Devon Bertram, Oct 21, 2011, 6:38 pm