v2009- SSc1: Site Selection- Wetland ProtectionNC-2009 SSc1: Site Selectionposted by Kathy Hrabovsky on Mar 4, 2020, 3:30 pm
Is a Category 1 Forest Conservation Easement permitted to protect the limits of disturbance between a project site and an existing... |
|
Previously developed and graded area by municipality- How long before construction?NC-2009 SSc1: Site Selectionposted by Ilan Yahav on Jun 11, 2018, 5:58 am
I am working on a Non-US project that is located in a new neighborhood that had been graded and developed by the local Municipality (roads and sidewalks) in 2006. Is there a time limit for sited... |
|
Is a Sports Field Considered Graded or Prime Farmland?NC-2009 SSc1: Site Selectionposted by Sophie Kerr on Mar 19, 2018, 9:43 am
Hello, Our project was built on a former sports field. I was wondering if a sports field (baseball) is considered graded or... Last reply: Paula Melton, Mar 22, 2018, 2:38 pm |
|
Previously Developed Site vs. Prime FarmlandNC-2009 SSc1: Site Selectionposted by Jennifer Carlson on Dec 18, 2012, 3:41 pm
I have a site that is currently on previously developed site. Utilities, sidewalks, etc are already in place. However the Soil Survey says the land the is... Last reply: Julie Hendricks, Mar 12, 2018, 4:41 pm |
|
Habitat for endangered/threatened speciesNC-2009 SSc1: Site Selectionposted by Ashley Hu on Nov 3, 2017, 3:06 pm
Hello there, I have two project sites in question. 1) An very urban site that was previously a parking lot 2) A suburban site that was previously graded (need further... |
|
Farmland of Statewide ImportanceNC-2009 SSc1: Site Selectionposted by Norma Lehman on Jun 28, 2017, 6:57 pm
Our project is LEED NCv2009 and the site is designated as "Farmland of Statewide Importance", but not Prime Farmland. We are trying to clarify Prime Farmland v. Farmland of Statewide Importance... Last reply: Tristan Roberts, Aug 26, 2017, 4:50 pm |
|
UPLOAD GOOD LITERATURENC-2009 SSc1: Site Selectionposted by bojana kovacevic on Jun 2, 2016, 6:26 am
If someone has good literature ( with clearly defined part for required documentation) of all SS and MR Credits I would be so happy if he/she share it with me.... Best regards! Last reply: Tristan Roberts, Jan 7, 2017, 5:46 pm |
|
Previously developed floodplainNC-2009 SSc1: Site Selectionposted by Anna Korinkova on May 19, 2016, 8:22 am
We have an office building project, which (according to the local planning codes) lies within a floodplain zone. It is our understanding that any development in this kind of zones cannot earn... Last reply: Anna Korinkova, May 25, 2016, 3:09 am |
|
Responsible personNC-2009 SSc1: Site Selectionposted by Lilian Seow on Nov 2, 2015, 2:34 pm
Who should be the responsible person signing the letter template for this credit? Unless the LEED Consultant is a qualified expert in site development relating to the prohibitions... Last reply: Tristan Roberts, Nov 27, 2015, 2:18 pm |
|
Previously Developed Prime FarmlandNC-2009 SSc1: Site Selectionposted by Haley Duncan on Jul 23, 2015, 2:01 pm
Hi, I saw a previous post and response that suggested submitting a... Last reply: Tristan Roberts, Nov 27, 2015, 1:24 pm |