Forum quick links
How to consider Emergency Lamps for this credit?
CS-v4 SSc6:Light pollution reductionposted by Milo Aguilar on
Our design review came back and for this credit they are asking to provide specs for all the lamps used for the credit including the emergency lamps. We have tried to find lamps with the
Is it necesary that the LEED AP Membership is up to date.
CS-2009 IDc2:LEED Accredited Professionalposted by Silvia Ruiz on
The original LEED AP has problems paying to renew his membership, is it necesary for that person to be active??
LCA for a renovated building?
NC-v4 MRc1:Building life-cycle impact reductionposted by Agnieszka Rylska on
Can Option 4 LCA be selected for a project of an existing building which is being renovated and with substantial demolition works?
recertification with a change in building type
posted by Sandro Paglia on
Hi to all,
I need support for a particular situation. A porject gained the LEED v2 core and shell certification and now the building is under renovation process.
Green power and carbon offsets
CI-v4 EAc6:Green power and carbon offsetsposted by T.A. Wheeler on
What does it mean for the Green power and carbon offset requirement to Engage in a contract for qualified resources..., for a minimum of five years, to be delivered at least annually ?
Pre-construction Risk Assesssment - Infection Control Risk Assessment Certificate Program
posted by Norma Lehman on
Good Afternoon!
Baseline HVAC System for Hotels
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear all,
Hotel with no guest.
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Michael Ortiz on
How would one calculate the energy used if there are not any guest to calculate for? Covid-19 will change many of the models we use and highlights the need to look at plug load as a real cost.
v4.1 - Ceilings and excluded overhead structural elements
NC-v4.1 EQc2:Low-Emitting Materialsposted by Michelle Bombeck on
Hi all - I'm working on a project pursuing the ceilings category and wants to shoot for the 90% by suface area threshold. This project also has excludable overhead structural elements.