Hello,
We are implementing a solar system on the roof of a commercial client in Vietnam. More than 50% of the power will be supplied from on-site solar generation.
Our client is applying to LEED certificate at the same time. The solar system will be leased to the client for a contract period. End of the contract period, the client will own the assets. The client pays per kWh solar power generated. The excess power will be feed into the utility.
What does the client need to get points from the project as “On-Site Renewable Energy” generation as well as Carbon Off-setting?
Best,
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.