Forum quick links
Track light power consumption
Retail-CI-v4 EAp2:Minimum energy performanceposted by Mahesh Shankar on
This one is a retail project in Thailand. The store has many tracklights due to which we are not able to get the required power savings in lighting.
Sunset date and timelines
posted by suveera kakkar on
Hello
SCL Water Sub-Group
posted by Patty Lloyd on
The Water Sub-Group met today. This group is working on three items:
1. Project Water Plan Template
2. Project Water Tracking Form Template
SCL Summit - Waste Subgroup Follow Up Call - Construction Waste Management
posted by Ali Flynn on
Hi all,
Energy modeling, Chiller at AHRI conditions
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Sánchez Sánchez on
Hi,
I’m modeling a building which has water-cooled chillers.
Submitting evidence in design or post-construction stage
NC-v4 EQc9:Acoustic performanceposted by Greenlab on
Hi,
We are in the process of replying to a LEED Certification Review – split review, design stage – of a building which is now close to completion.
Energy Model Room category for server room relevant in baseline building
NC-v4 EAc2:Optimize energy performanceposted by Benjamin Weise on
We're modelling an office building (space by space method) with a relatively big server room (50kW).
Functions of the same product
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Hashir Usman on
Hi all,
Clarification Re. General Emissions Requirement for Multi-part Acoustical Wall Treatment
NC-v4 EQc2:Low emitting materialsposted by Vanessa Nelson on
We have a project with sound recording studios with drywall throughout and an acoustical wall treatment that will be assembled on site and attached to select portions of the drywall.