Core & Shell with HVAC as future / CI scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Stacey Olson on
If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?
Existing Building HVAC being upgraded and will serve new addition - LPB?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sue Bryant on
WE have a project that is an addition to an existing building. The addition is served by the HVAC from the existing building.
Uploading of Construction Credits
posted by Stephen Sgro on
We are currently under preliminary design review on a LEED 2009 Schools (split review) project. We received LEED prelim.
Maintaining 3rd Party
NC-v4 EAc1:Enhanced commissioningposted by Brett Farbstein on
I have had success acting as the fundamental & enhanced CxA as an employee of the project architect as long as the design team included an outside MEP engineer in v2009.&nbs
energy recovery control
CS-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I’m modelling a System 8 baseline model according to ASHRAE 90.1-2010.
An exhaust energy recovery system is needed according to table 6.5.6.1.
Number of Parking Spaces Required by Local Code.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Adrian Arenas on
Hello Everyone,
One quick question regarding SSc7.1
For Option 2, to comply with 50% of parking spaces undercover:
DES cooling load reduction
NC-v4 EAc4:Demand responseposted by Nuttanee Vongveeranonchai on
Dear all,
Number of points awarded for RP
NC-v4 RPc1:Regional priorityposted by Amrit Kaur on
How can I find out how points I would get for a particular RP. Is it always only one point if I pass the threshold?