Does IT and AV equipment need to be installed prior to IAQ testing?

CI-v4 EQc4:Indoor air quality assessment
posted by  Diana Smiciklas  on 

Does IT and AV equipment need to be installed prior to IAQ testing? We are moving offices and our IT team will be dismantling and reinstalling AV and IT equipment the weekend prior to our move.

1
Tue Feb 16, 2021, 5:46 pm

Modeling a DOAS Serving Shell Space

CS-2009 EAp2:Minimum Energy Performance
posted by  Cory Duggin  on 

We have a fully designed DOAS that provides ventilation to the core and shell spaces of the building.  Since the DOAS is fully designed, can we have it provide the ventilation to the shell spa

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 7, 2018, 4:11 pm

Appendix G system type for addition

NC-2009 EAp2:Minimum Energy Performance
posted by  Hilary Giffen  on 

I have an addition to a manufacturing plant. The addition has its own HVAC system so the LEED boundary encompasses just the addition.

10
Fri Sep 7, 2018, 4:09 pm

EKOenergy labeled I-RECs

Retail-CI-v4 EAc6:Green power and carbon offsets
posted by  Raissa Petri  on 

Hello, 

May I use EKOenergy instead of I-RECs for this credit?

Or EKOenergy labeled I-RECs instead of "REC Brazil" labeled I-RECs? 

Thank you!

3
Fri Sep 7, 2018, 4:07 pm

Greenfield with Underground Utilities

NC-v4 LTc2:Sensitive land protection
posted by  Cathal Heneghan  on 

Hi all

My project is a green field site apart from utility services (water and electric) which run underground through a portion of the site for neighbouring buildings.

1
Fri Sep 7, 2018, 11:10 pm

Off-Site Waste heat

NC-v4 EAp2:Minimum energy performance
posted by  Marcus Sheffer  on 

There were a couple of previous posts on this subject, one from an industrial process and one from a data center that were located outside the LEED project boundary.

2
Fri Sep 7, 2018, 3:07 pm
9
Default Avatar
Systems Director
HOLOS
LEEDuser Basic Member
15 thumbs up
Fri Sep 7, 2018, 2:56 pm
3
Director of Building Sciences
Page
LEEDuser Premium Member
3 thumbs up
Fri Sep 7, 2018, 2:49 pm

No cooling tower in design but core and shell spaces modeled as neutral with cooling tower in energy model.

Pilot-Credits WEpc94:No Cooling Tower
posted by  Chris Yates  on 

A project I am working on meets all the requirements for the design (no cooling tower, no use of the latent heat of the evaporative cooling of water, no cooling from a Dist

1
Tue Aug 25, 2020, 7:09 pm

Historic District in vicinity

NC-v4 LTc3:High priority site
posted by  Timothy Hillhouse  on 

I am working on a project in a rural NC town which has a historic district in its downtown area.  Our project is downtown however the historic boundary goes around our block essentially surrou

0