Forum quick links
CALGreen Projects and BUG Rating
NC-v4 SSc6:Light pollution reductionposted by Michelle Rosenberger on
Hi all,
SASAKI Director of Sustainability and Resilience
posted by Meredith Elbaum on
Hi All,
Sasaki is hiring a Director of Sustainability and Resiliency. See attached. Please forward along to folks who might be interested.
-Meredith
HPD v2.1 - Statement about Special Conditions when "No" is indicated for Characterized, Screened, or Identified
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
I’m currently reviewing a HPD v2.1 for LEED v4 Building Product Disclosure and Optimization – Material Ingredient Option 1.
Anticipated
CI-2009 SSc2:Development Density and Community Connectivityposted by Hana Altabbaa on
On the LEED review report we received after the initial Design submittal we had this credit labelled as (Anticipated) and there was no technical advises from the reviewer, We are in the process&nbs
Disabled parking facility
CI-v4 LTc5:Reduced parking footprintposted by werdah shahid on
Daylight - Option 2 Attached Furniture Systems
CI-v4 EQc7:Daylightposted by Amanda Gillen on
I am working on the documentation for Daylight using Option 2. The Credit form asks that you "describe attached furniture systems included in the simulations". What exactly are they refering to?
Regional material distance calculation method
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Lawrence Rennell on
According to LEED 2009, there were alternate distance calculations available that applied to products shipped by rail or ship.
Greenfield
NC-v4 SSc2:Site development - protect or restore habitatposted by Karl Heitman on
Our 18 acre project site includes non-build-able waterfront with water detention.
LIght Pollution Reduction only applicable to exterior lighting?
NC-v4 SSc6:Light pollution reductionposted by Benjamin Weise on
Hello!
Do the requirements for the light pollution credit only apply to exterior lighting or do interior lights also need to be evaluated for the credit?
Is underground Parking included in Certification fees calculations ?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Amine Zeidane on
Hello,
I have an office building project with the following data :
Total GFA (3 underground parking levels + 8 levels above the floor) : 83 108 sf