Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Roll-out mats details

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Summer   on 

Anyone can confirm if all roll-out mats should be provided with zocallo to insert the carpet?

1
Fri Nov 9, 2018, 3:41 pm
3
Energy Efficiency Ninja
Grumman/Butkus Associates
LEEDuser Premium Member
64 thumbs up
Fri Nov 9, 2018, 3:05 am

Animal Research Facility with attached gates

EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additions
posted by  Amy Burns  on 

We are a higher education campus and are Facility Alteration that had attached gates that were used for the animal research but are not needed now.

2
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Thu Nov 8, 2018, 11:44 pm

VOC budget process in this credit

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Albert Sagrera  on 

Can I use the same "VOC budget process" to justify this credit as in credit 4.2 if I make a misatke or If I have just one product that is used minimally on a project?. Thanks

5
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Thu Nov 8, 2018, 11:28 pm

Certification required to perform pressure differential test?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Vanessa Nelson  on 

Is a certification required to perform the pressure differential test? I'm wondering if it needs to be done by a specialty testing company or can it be done by the Mechanical Sub?

1
Thu Nov 8, 2018, 11:30 pm

Documents - which Language?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ernst Schriefl  on 

Hi,

 

This is maybe an obvious question but our projects are located in Austria. Therefore most of our documents are in German.

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Thu Nov 8, 2018, 7:58 pm

Single Phase UPS

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Omar Delgado  on 

Greetings all, I have a CI project that has single phase UPS, PoE Switches, and some AiroNet AP. Are all these excluded from the calculation? Thanks!

3
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Thu Nov 8, 2018, 7:58 pm

calculating rated power and bigger questions

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Michele Helou  on 

I cannot get the nameplate power from an Energy Star residential refrigerator used for a commercial project. I called the manufacturer, checked the manuals, etc. no luck.

5
Thu Nov 8, 2018, 7:57 pm

More on UPS s

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Susan Di Giulio  on 

Hi, I understand all the previous discussion UPSs but our situation is just a tad different, The project in question is intensely tech related, and the UPS needed as backup is a 3 phase, 50,000 kV

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 7:56 pm