Forum quick links
Project without landscape area
NC-v4 WEc1:Outdoor water use reductionposted by Azfar Mohamed on
Hello everyone,
Currently, we have a manufacturing facility registered for LEED NC BD+C V4.
This project does not have any landscape area at the moment.
Carpets with the same GLP Certification
CI-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
Carpet products seem to typically have Green Label Plus certificates that refer to the carpet backing being used, rather than any particular carpet style or product name.
Making the case for Passive House
posted by Kate Bubriski on
Does anyone know of reports/studies of financial benefits from the developer perspective on Passive House multifamily projects? Specifically looking for market rate (not affordable) housi
SSc4 Surveying Staff Throughout Building
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Alexis Doyle on
Hello,
LEED ID+C, V4, Retail shop in a mall
Retail-CI-v4 EAp2:Minimum energy performanceposted by Toshif Ruikar on
Hi, My project is an retail shop in a big mall.
LEED Homes Certification in Uruguay
posted by JUAN FELIPE BARBOT GIORDANO on
Hi there,
LEED EBOM v4 minimum occupancy requirements
EBOM-v4 EAp2:Minimum energy performanceposted by on
Hello,
Does LEED EBOM v4 require a minimum occupancy requirement to be able to be certified?
Mixed use buildings minimum storage spaces
NC-v4 LTc6:Bicycle facilitiesposted by Yara Salama on
Hello,
feed back the survey
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Junko Miyamoto on
Hellow.
I need to complete the feedback survey for achieving the pilot credit point. Is the project information that input in the survey will be published ?