Forum quick links
MInisplit Units
NC-v4 EQp1:Minimum indoor air quality performanceposted by Paula Hernandez on
Hi, I would like to know if minisplit (non-ducted) units have to comply with Standard 62.1-2010, Section 5.8, "...p0articulate filters or air cleaners with a minimum efficiency reporting valu
LEED v4.1 Construction Waste Calculator
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Mary Lea Tucker on
Are the point amounts listed in the summary of the calculator incorrect? They don't seem to match the 4.1 guide. Did I miss an update?
Daylight and Quality views - regularly occupied space exemption for unique fire station sleeping rooms
NC-v4.1 EQc7:Daylightposted by Ken Gallegos on
Our project is a military fire station/training center in which on-duty fire fighters have alternating schedules and individual occupant sleeping rooms are designed to be used for sleepin
Estimating Embodied Carbon with Limited Info
posted by Colley Hodges on
Hope I'm posting this in the right place. I have a client who's interested in estimating the embodied carbon of multiple buildings (primarily apartment buildings) they own and operate.
Ascent Macerating Toilet
CI-v4 WEp1:Indoor water use reductionposted by Niccolo Benghi on
We are planning on using an ascent macerating toilet. I was wondering how to properly specify it in the Water Use calculator. Would this fixture be allowable?
Time to Register for the Sustainable Construction Leaders Summit!
posted by RoseAnn Grimes on
Hello Sustainable Construction Leaders!
Reclaimed Material as Diverted Waste
NC-2009 MRc2:Construction Waste Managementposted by Jeannie Rhoden on
We used a quarry as an end user where we hauled land clearing debris and dirt/rubble. It has been reclaimed and used as quarry fill. Can this be considered diverted waste?
Occupancy before building is finished
NC-2009 PIf4:Schedule and Overview Documentsposted by Victoria Rios Esteve on
Hi everyone! Im pretty sure this question is not rightly set in this category, but here we go...
BUG rating method
NC-v4 SSc6:Light pollution reductionposted by Michael Smolyansky on
1. Question for SSc6 Table 3 : What is meaning "All other luminaires" in Allowed glare rating chapter? Does it mean all luminaires in site oriened properly or not should meet this "G" criteria?
Indoor Air Measurements: required measurement duration
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Roland Braun on
Hi to all: