Forum quick links
Does it have to be EXISTING infrastructure?
ND-Plan-v4 SLLp1:Smart locationposted by Jeanne Davidson on
For this pre-requisite, we are developing a materplan where the buildings will be compliant with Option 4 once they are built. But they are not there yet and we are in the middle of a desert.
Total annual energy consumption in complex railway station in India
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
The railway station has one entry building which is connecting by foot over bridge with platforms.
Recommened software for doing the Interior and Daylighting analyses.
NC-v4 EQc7:Daylightposted by Jorng-ren Chern on
We’re in search for a suitable software to do the Interior and daylighting analyses for LEED V4.
STC requirement for a Retail area next to a hallway in a medical building
NC-v4 EQc9:Acoustic performanceposted by Todd Bundren on
We are working on a new medical buidling (cancer center) and there is a gift shop off a large corridor close to the main entry.
Campus standards for Energy Savings: Plug Loads, Occupant Behavior
posted by Christopher Schaffner on
HPDC needs you!
posted by Rand Ekman on
I am dual posting a topic from the SDL forum in the Green Commons. Sorry to those who see this twice but I'm trying to cover more ground.
New Peer Networks Hub and rest period Dec. 23 to Jan. 5
posted by Amanda Farman on
Hi everyone,
Help needed with ARC platform
EBOM-v4 MPR1:Must be in a permanent location on existing landposted by Antonio de Sousa Filho on
Hi everyone,