Forum quick links
Specification software
posted by Margaret Montgomery on
Our specification team is currently piloting and testing new software to replace E-specs without an easy favorite, and would really love to know what other firms are using.
Can partial regional criteria (e.g. 85% regional) materials count towards regional multiplier?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Summer Gorder on
Hi All,
Can a product meeting one of the basic credit criteria, (recycled content) also count for the regional multiplier if it is 85% Regional?
BuildingGreen Matchmaking: Sustainability PM Opportunity
posted by Jill Maltby-Abbott on
Hi, all -
Documentation Clarification
Mid-Rise-v4 EQc7:Low-emitting productsposted by Patty Lloyd on
So clarifying that for compliance with this credit, documentation that the product is complianct with CDPH v1.2 is enough?
Electric vehicles charging stations
CS-v4 EAc2:Optimize energy performanceposted by Rihab Joucht on
I want to make sure if we include the EV charging in Energy Model ? As mentionned in 10499 - EV Charging in Model | U.S.
Open Space and Vegetated space calculation
NC-v4 SSc3:Open spaceposted by Kavita Karmarkar on
Hi all,
Need a Template or format for preparation of ESC Plan
NC-v4 SSp1:Construction activity pollution preventionposted by Mujib ur Rehman on
Dear All,
Estimating energy savings from digital TAB measurements
posted by April Spence on
Hi all,
Government-mandated roadway lighting exemption - definition
NC-v4 SSc6:Light pollution reductionposted by Lenka Matějíčková on
Working on a car manufacturing plant, we would like to explore if roadway lighting within the area of the plant can be extempt from the assesment.