Forum quick links
Use of Whole Building model to predict the energy consumption for each meter
NC-v4 EAc3:Advanced energy meteringposted by Lise Dannesboe on
Hi.
Hope some can help.
Vacant Building - Minimal Occupants to Survey
EBOM-v4 LTc1:Alternative transportationposted by Levi Jimenez on
The MPR for minimum occupancy has been relinquished for LEED EB v4, so we are pursuing a building having only a couple of occupants, in a single tenant building that is currently between tenants.
why necessary to include all buildings in the density calculation?
CI-2009 SSc2:Development Density and Community Connectivityposted by Courtney Royal on
hello...
Denied Exemplary Performance
NC-2009 IDc1:Innovation in Designposted by Jody Boelhauf on
If you are denied an Exemplary Performance in the Design submittal, can you revise that credit to submit an Exemplary Performance for a different credit, to get the maximum 3 Ex Perform?
shower flowrate
Homes-v4 WEc1:Total water useposted by Emmanuel Pauwels on
If multiple-head showers are installed in a single shower compartment, the reference guide states that we need to sum their flow rates and enter the result as one fixture.
Habitable buildings
ND-Plan-v4 MPR3:Must comply with project size requirementsposted by Antonio Macedo Filho on
Hi, Eliot!
The project must have at least two habitable buildings, but it would necessarily residential buildings? Would this "habitatable" word be in the sense of residence itself?
IS Pre-Consumerpercentage fo mrc4 considered for extraction Point in mrc5?
NC-2009 MRc5:Regional Materialsposted by Jonathan Foley on
Hi, first time user here.
underfloor system supplying minimum outside air with radiant panel
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by X. Chen on
Hi, we are designing a project that has a DOAS unit serving code min outside air through underfloor plenum to the space with ceiling radiant panels handling heating and cooling load.
ASHRAE Level I and II Audit timing
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Izabela Kwiecinska on
Hi,
FSC x PFEC
NC-2009 MRc7:Certified Woodposted by Karyn Rodrigues on
I am working for a project in Barcelona which is pursuing LEEDv2009 certification.