NC-v4 EAc1:Enhanced commissioningposted by Matt Grace on
Is it agreed that a project can pursue MBCx without first achieving Advanced Energy Metering?
Cheers,
Matt
Water Meter Accuracy
CS-v4 WEp3:Building-level water meteringposted by Ciaran McCabe on
For Water meters under LEED V4 is there any requirements in terms of their accuracy ?
LEED for tenant build outs within LEED certified building
posted by Elliot Young on
Hello and thank you ahead of time for your input.
LEED CS V4 Design of Snow park
CS-v4 EAp2:Minimum energy performanceposted by Shahana Sayed on
What should be the EAp2 baseline consideration for snow park/ski park within a mall in UAE.
Labelling of waste containers
NC-v4 MRp2:Construction and demolition waste management planningposted by Lise Dannesboe on
Hi.
Envelope & Hazardous Materials
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Emily G on
Working on a historic renovation of a school building. Two building reuse questions: 1.
OA Monitoring for DOAS serving several HPs
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Logan Dorrell on
For Case 1, Type 2, where at least 20% of the system serves non-densely occupied zones, we have a situation where (1) dedicated outside air system (DOAS) serves several smaller heat pump (HP) zones
CS-v4: Only 1 water subsystem available to be metered, 2nd subsystem proposed to be metered in future. Is this acceptable?
CS-v4 WEc4:Water meteringposted by Mugdha Mokashi on
We are working on a core and shell project which currently has no indoor plumbing fixtures installed. So we have just one sub-system to meter (irrigation).
DES or NO DES?
NC-2009 EAp2:Minimum Energy Performanceposted by Aru Sau on
In this project, we have one office, two plants signed up for LEED Campus.