RP Credit Lookup: Invalid Location in the City
Retail-CI-v4 RPc1:Regional priorityposted by Marjorie Oblinada on
Hi. My team is currently working on certifying a LEED v4 ID+C:Retail project and wishes to pursue the regional priority credits to gain additional points.
Cost of permanently installed products - use default 45%?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Deborah Lucking on
I have not been able to find any guidance on this - is it still acceptable to use the default of 45% of the contract value to determine total material cost?
Modeling Mechanical Systems for Core Areas
CS-v4 EAp2:Minimum energy performanceposted by Chris Hammett on
I am working on a project that includes some limited core areas such as lobby, electrical rooms, restrooms, etc. and spaces allocated for future tenants.
Renovate BD+C v2009 building envelope?
posted by Sareet Benayahu on
Hello,
IEQ CREDIT 4.3
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Carlos Salas on
hola, en un ensayo de emisiones COV, ¿el formaldehido se debe tener en cuenta? Un suelo técnico formado con una madera encapsulada metalica, debe cumplir el test CPHD?
Gracias.
Lighting power allowance - loading bays
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I am current working on a project looking for certification under LEED V4.
Winter Summit 2018--PreSummit Tours
posted by Nadav Malin on
We had a small group tour the Dell Seton Medical Center campus today, and a much larger group tour the new Austin Public Library.
Daylighting controls for primary sidelighted areas for baseline
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In the refurbishment that was designed internal partitions will be removed and the rooms will become bigger than the existing ones.