Forum quick links
Conflict with energy efficiency in extreme climate
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Ranya Metwalli Shields on
We are optimizing a 4 storey residential building for certification under LEED EBOM (it is currently under construction) . Most residential units will have to allow smoking .
Waste Stream Audit - metals and wet waste
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Pablo Fortunato Suarez on
The project is going for re-certification and was previously awarded this credit. In the new online form, there are prescribed categories.
Metered Faucet: Max GPC or Flow Rate x Duration?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Christian Kaltreider on
Hello, My project will use metering handwash faucets at the lavatories. The flow rate is 0.5 gpm.
Case 2, Option 1 - how many different support programs required?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Erica Downs on
There is a thread below (started April 2013, subject line: Mixed use
submetering general requirements and strategy for metering HVAC
CI-2009 EAc3:Measurement and Verificationposted by Rob Pinkston on
Hello, We are working on a low-rise office building and pursuing LEED CS v2009 for the base-building and LEED CI v2009 for at least one of the tenant spaces.
Fiberglass Fiberboard Adhered to NAUF MDF
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Andrée Iffrig on
One of our clients is planning to use a tackable fabric tile composed of NAUF MDF, fiberboard (fiberglass with a urea formaldehdye resin), UF-free adhesive and fabric. The tile is like a sandwich.
Adhesive credits
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Patricia Taylor on
As a Flooring contractor, I get many customers that request we submit LEED information many different ways. A couple have asked that I break out the qty and total material cost for adhesives.
tenant submetering?
CI-2009 EAc3:Measurement and Verificationposted by Courtney Royal on
We have a LEED-CI project occupying one floor of a building, but the project space will be occupied by multiple tenants.
Dimension of entryway systems
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by LEED Pro Consultant on
Hi, We are trying to apply this credit in a small office building, so we want to know if the dimension of entryway systems can be modified due to three meters is a very large distance in a building
Cost Savings from an Owner PPA
NC-2009 EAc1:Optimize Energy Performanceposted by David Hart on
If an owner constructs a remote net-metered PV system as part of a power purchase agreement (PPA), can the PPA cost savings be used to increase the efficiency (cost) savings vs.