Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Areas passing at one time but not another

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Lisa Fabula  on 

If part of the building area passes at 9am but does not pass at 3pm does that mean we cant use that 9am area for that time.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Mar 27, 2015, 4:06 pm

Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air Unit

NC-2009 EAp2:Minimum Energy Performance
posted by  Ivan Priatman  on 

Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone.

9
Senior Designer
PT. Archimetric
LEEDuser Basic Member
4 thumbs up
Fri Mar 27, 2015, 10:02 am

Minimum Ventilation rates for Production area

NC-2009 IEQp1:Minimum IAQ Performance
posted by  sriram tetali  on 

Hi all Can u suggest the Ventilation rates for the Production / manufacturing areas for a Pharmaceutical clients because ASHRAE doesn't mention any for the Production in the Table 6-1

3
Manager -Sustainability Services
M W Group
LEEDuser Basic Member
1 thumbs up
Fri Mar 27, 2015, 7:01 am

Hello,
I am documenting this

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Michael Russo  on 

Hello, I am documenting this credit using the simulation method. For many of the regularly occupied spaces, the rooms are above the 10fc requirement except for a small corner of the room.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Mar 26, 2015, 11:00 pm

Healthcare MRc4.1: rated hours for lamps or ballasts?

Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lamps
posted by  Megan Shelby  on 

For LEED-Healthcare MRc4.1, can you confirm that the rated hours criteria is for the lamp or the ballast?

2
Principal
Schuler Shook
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 9:17 pm

Duration for online survey

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Jessica Hawley  on 

We are planning on sending out an emailed link to an online electronic transportation survey on a Monday to survey our building's entire tenant population about their commute for the prior week (M-

3
Default Avatar
Real Estate Sustainability Professional
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 9:09 pm

Is EAc2 affected by the use of the ACP calculation for EAc1?

CS-2009 EAc2:On-site Renewable Energy
posted by  Charlie Christenson  on 

Working on a core & shell project that is planning to install a PV system sized to offset 1% of total building energy cost.

3
Thu Mar 26, 2015, 7:05 pm
11
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 26, 2015, 3:25 pm

VOC limits for the welding of PP-R

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Panupant Phapant  on 

Dear All Our project uses PP-R pipe (Polypropylene Random Copolymer) for chilled water piping. The PP-R pipes is connected together by welding.

3
Default Avatar
SCG Cement - Building Materials
LEEDuser Basic Member
13 thumbs up
Thu Mar 26, 2015, 11:19 am

A site with large building footprint

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Magda Aghababyan  on 

Hello, Mine is a greenfield site that has a building footprint that takes almost the entire land.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu Mar 26, 2015, 3:52 am