Not sure what we can do with this credit
EBOM-v4 SSc6:Site improvement planposted by Meier Corporate Account on
Our facility was constructed in the center of 96 acres of asphalt. The area had been asphalt for well over 20 years before this.
Submetering water
CS-2009 IDc1:Innovation in Designposted by Marina Andrade on
Hello, Can I attempt for Inovation in Design for an office building project that is pursuing LEED for CSv.e by installing individual water submeters for each tenant? Thanks in advance
Occupancy Density and Fresh Air Calculation
NC-v4 EAp2:Minimum energy performanceposted by Ahmed Labeeb on
Dear,
Input Needed to Shape Federal Climate Policy
posted by Michael Davis on
Greetings, colleagues!
Date of C2C certificate
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Charline SEYTIER on
The C2C certificates are ussually valid for 1.5 or 2 years, some will come to an end before the end of the project and maybe before the products are purchased.
Addenda item from 1/5/2018 - Required Documentation table
NC-v4 EAc5:Renewable energy productionposted by Erica Downs on
Hello - I was reviewing the Reference Guide addenda items, and there is one for this credit that just does not make sense. It is regarding the Required Documentation table, page 439 in the RG
Option 1 & 2
NC-v4 EQc6:Interior lightingposted by Christine Chow on
Are existing light fixtures required to be included in the calculations for both options?
WS 2018--Design & Health
posted by Nadav Malin on
WELL & Fitwel and beyond.
Guiding Questions:
New renewable energy that is not double counted - enough?
NC-2009 EAc6:Green powerposted by Maria Porter on
Another question for another project: The project has purchased shares in a new solar park, Sweden’s biggest when it’s finished.