Forum quick links
ILFI Unconference
posted by Anne Hicks Harney on
We are T-minus two days from the ILFI unconference and I am looking forward to seeing a bunch of you there. I have a vague memory about there being a meet up scheduled - can somebody rem
DES Baseline and Proposed
NC-2009 EAp2:Minimum Energy Performanceposted by Bas Peeters on
Dear all,
Warehouse baseline system
CS-v4 EAp2:Minimum energy performanceposted by Instra Ingenieros on
Dear all,
Sharing Building-Level Energy Metering Data
NC-v4 EAc3:Advanced energy meteringposted by Francis Hernández on
We have a LEED v4 project for the Corps of Engineers that is connected via the local installations BMS to a remote location for managing the buildings energy systems. The meters and submeters
Compliant laboratory and medical equipment
NC-v4 WEc2:Indoor water use reductionposted by LEED Pro Consultant on
For equipment such as steam sterilizer and sterile process washer, the requirement mentions liters/DIN tray, does the tray has to be any specific measure?
Lack of Sunday bus service
NC-v4 LTc5:Access to quality transitposted by Karen Joslin on
I believe the intent of the emphasis on some level of weekend service means both Sat and Sun. If there are 0 trips on Sunday we cannot average with the high number of Sat trips can we?
Base Building certifcation in progress
CI-2009 PIf5:Previously LEED Certified Detailsposted by Gail Napell on
we have a v2009 project in a base building that's in process for LEEDv2009 EBOM certification. We're ready to submit the design credits for review, but the landlord doesn't expect to have the
EPD as an alternative approach to comply with Option-4 requirements
NC-v4 MRc1:Building life-cycle impact reductionposted by Osman on
Hi all,
Is it acceptable to quantify for the impact measures in the proposed building using EPD?
Thank you so much for your support,
Osman
Demolition Waste for entire building vs area designated to be LEED Certified.
CI-v4 MRp2:Construction and demolition waste management planningposted by Timothy Hillhouse on
We are renovating a 84,000 sqft warehouse and only LEED Certifying a portion of it 9865 sqft. Should all the construction waste & recycling only be calculated for the small area being cer