Submitting for Construction Preliminary Review
posted by Ivy Glasgow on
I'm hitting the big green button for my project's Construction Preliminary Review.
Energy Star
CI-2009 EAp2:Minimum energy performanceposted by LEED Pro Consultant on
Hello! If we choose the performance option (Section 11), do we still have to comply with the 50% rated power Energy Star?? Thanks!!
Building Reuse of a previous LEED buiilding on same site
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Dan Milewski on
I have a question regarding compliance with this credit as long as MR Credit 1.2. Would this credit apply to a situation in which we are renovating (i.e.
Master Site and Campus Credits - LEED Boundary for Projects
posted by Donald Green on
The following was a post by K Kraft on Jan 2, 2014 that did not receive a response - I would like to ask the same question as well as an additional question as follows: Where does "normal support"
Performing Arts Building may have periodic smoking on stage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Sara Greenwood on
Hello, I am working on a performing arts building that has a no-smoking policy for the interior and within 25' of the building.
Equivalents in Europe
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Mike D on
Has anyone ever used local equivalents instead of the Energy Star rating? ID#1492 states that we can use local equivalents.
Building with future additions connecting interior spaces
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by LEED Pro Consultant on
Hello all, We are working on an industrial facility with an adjacent office building that is looking for a NC certification LEED v2009.
Insulation and UF
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Sheryl Swartzle on
Would insulation be exempt from the "no added UF" requirement?