Log in
Forum » Pilot-Credits SSpc55
Loading...
Topic

Exterior Lighting- Confirm only one option for compliance

Pilot-Credits SSpc55: Bird collision deterrence
posted by Jasmine A on Aug 1, 2019, 7:25 pm

Hello all, 

This should be an easy one but the LEED requirements aren't clear to me on this. The following USGBC page doesn't distinguish (or label) option 1 vs. option 2: ...

How many SF and which area of the building needs Bird Collision Threat.

Pilot-Credits SSpc55: Bird collision deterrence
posted by Miguel Rivera on Mar 18, 2019, 5:49 pm

Hi, I'm a little confused.

After made all the calculations for a project of 6 stories with three different types of materials in the facades, I don't understand which and how many...

Last reply: Stefan Knust, Mar 20, 2019, 4:49 pm

Montioring Plan- Submission

Pilot-Credits SSpc55: Bird collision deterrence
posted by Johanna Huddle on Aug 16, 2018, 1:58 pm

Once the 3 year period is up, what happens to the documentation the occupants fill out about the bird collision? Do they get uploaded to the USGBC?
 

Last reply: Lourdes Salinas, Nov 29, 2018, 12:27 pm

Monitoring Plan

Pilot-Credits SSpc55: Bird collision deterrence
posted by Cynthia Fierro on Nov 1, 2018, 7:44 pm

By completing the three-year monitoring plan, what would be the follow-up to the plan?

Last reply: Paula Melton, Nov 6, 2018, 12:00 pm

Typical review comments?

Pilot-Credits SSpc55: Bird collision deterrence
posted by emily reese moody on Oct 31, 2018, 4:26 pm

Hi all, 

Just curious if anyone has submitted this credit several times, and if they see similar comments get returned in the reviews more than once...?

Exterior Luminaire Schedule Format

Pilot-Credits SSpc55: Bird collision deterrence
posted by Alfredo Davalos on Oct 5, 2018, 2:10 pm

Hi All,

Does anyone know if the fixture luminaire schedule showing uplight ratings, night time off duration and manual override capability has to come in a specific format or...

If you are already meeting SS c8...

Pilot-Credits SSpc55: Bird collision deterrence
posted by Cynthia Kaplan on Sep 6, 2016, 9:27 pm

...Then the lighting requirements for SS pc55 should be a foregone conclusion, no?

Last reply: Chris Yates, Sep 7, 2018, 10:03 am

"..surface reflection and visibility of any surface 3 frit patterns.."

Pilot-Credits SSpc55: Bird collision deterrence
posted by Maciej Starewicz on Aug 10, 2018, 6:51 am

In General Pilot Documentation Requirements we can find the following position:

  • A narrative or statement acknowledging that both surface reflection and visibility of any surface 3...

Facade Composition vs. Blocking

Pilot-Credits SSpc55: Bird collision deterrence
posted by Heath Waldorf on Aug 8, 2018, 3:26 pm

Hi. Working on a transportation hub project where the west facing multistory 50-60' glass facade is broken up vertically by an adjacent roadway bridge that runs the length of the building at the...

Interior lighting requirements?

Pilot-Credits SSpc55: Bird collision deterrence
posted by Erica Downs on Aug 2, 2018, 2:18 pm

Hello - Clarification question... The text under "LEEDuser's Viewpoint" on the credit page includes requirements for interior lighting.  However, there is no mention of interior lighting...

Last reply: emily reese moody, Aug 2, 2018, 3:48 pm