I'm currently working on a Core and Shell project.
Military Base contamination
NC-2009 SSc3:Brownfield redevelopmentposted by Kim Lombard on
Our client on a Military base has uncovered asbestos piping underground during construction. They have properly disposed of the contamination as a normal SOP.
Kindergarten restooms w/ no occupancy sensor-OK or huge problem?
NC-2009 EAp2:Minimum energy performanceposted by Kathryn West on
discovered a potential oversight on a building design: some restrooms intended to be used by very small kids are equipped with light switches and no occupancy sensors.
Site Assessment documentation
Pilot-Credits SSpc45:Site assessmentposted by Mara Baum on
We've been following the credit requirements throughout the design process and are now starting documentation.
Combining Option 2 and Option 3
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Meghan Ward on
We are working on an Office project located 3 miles from a rail station.
Revised Section 1 4 Tables
NC-2009 EAp2:Minimum energy performanceposted by Khaled Fouda on
For the Energy Model I have used the (architectural drawing) for the proposed model, some wall sections were provided with its R-values from the manufacturer too.
Data centre and office
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Chilufya Lombe on
Hi, we have 2 buildings on our site pursuing two separate certifications. One is an office building and the other a data centre (one client).
Bicycle paths for Kindergarten
Schools-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Charalampos Giannikopoulos on
Does anyone know whether bicycle paths are necessary at a kindergarten facility with no students above grade 3 level? Bicycle storage will be only available to staff members.
ASTM Comparison
CS-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Michael E. Edmonds-Bauer on
We have a paint that has been tested under ASTM D5201 and some other with ASTM D3960, but the Green Seal standard GS-11 states that the tested method needs to be the ASTM D6886-03. Does anybody kn
Number of workstations for Hotel rooms
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Nelina Loiselle on
According to the IEQ Space Matrix, hotel rooms can be included in 6.2/6.2. So if you choose to include hotel rooms for IEQc6.1 and 6.2 do you count each room as one workstation?