Does a product containing 0 g/L VOC still need emissions testing?
NC-v4 EQc2:Low emitting materialsposted by Gretchen Krumm on
Does a product containing 0 g/L VOC still need to show emissions testing certification?
WA State DES requirements align
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Michelle Bombeck on
We are pursuing this credit on any of our WA State projects run by Dept of Enterprise Services as they require prevailing wage and apprenticeship requirements in alignment with the credit.
Shuttle bus service (in the large campus) can claim a part of quality transit?
Healthcare-v4 LTc5:Access to quality transitposted by Pongpitch J. on
In case of LEED-NC, The Building in the large campus site, provide shuttle bus service at a pickup point1 to other major transit facilities outside at pickup point2 (gate entrance).
Can reuse of an existing sealed or polished floor be included?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by on
And in this case, since the slab is structural, the replacement cost would just be the cost of the sealant or polishing process, right?
EPD is not an evidence
NC-v4.1 EQc2:Low-Emitting Materialsposted by Simona Kabadova on
Hello colleagues,
Overhead vegetated canopy
NC-v4 SSc3:Open spaceposted by Agnieszka Świetlik on
Hello,
What does it mean "overhead vegetated canopy"?
Is it a green tunnel with ivy or similar vegetation?
Structure and enclosure / Whole Building LCA
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Nove Sol on
Hello,
Whole Building LCA
NC-v4 MRc1:Building life-cycle impact reductionposted by Nove Sol on
I have three questions about whole building LCA. I have a client who wants to evaluate the impact of wood vs concrete building construction.
GHG emission factor - renewable energy and operating hours-EA energy performance O+M v4.1
EBOM-v4.1 EAp3:Energy Performanceposted by RICCARDO BALLESIO on
Hello everyone,
in the previous version LEED EBOM v4 was possible to consider and take some points if the energy from grid was green power certified.