Recent

What could be considered as "physically accesible"?

NC-v4 SSc3:Open space
posted by  Pablo Muñoz  on 

Could we consider physically accesible a roof open to all tenants but without an elevator (the only way to get there is through the stairs)?

0

Innovation: WELL Features in v3

NC-2009 IDc1:Innovation in Design
posted by  Agnieszka Rylska  on 

Hello,
I would like to ask if innovation credit from LEED v4 ‘WELL Features’ can be acceptable in LEED v3 in the innovation category?
Thank you in advance for your answer.

1
Fri Sep 20, 2019, 8:38 pm

CxA to be an individual

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Omar Elrawy  on 

Concerning all projects (either under or above 20,000 sqft), can the Cx Authority be an individual and not an organization?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Sep 12, 2019, 12:21 am

Concrete bonding agent below slab on grade

NC-v4 EQc2:Low emitting materials
posted by  Vandita Mudgal  on 

We have to use a strong concrete bonding agent below a 2 to 3" Slab on grade to stick with the concrete foundation below the structure.

9
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Wed Sep 11, 2019, 5:21 pm

exemplary performance in v6 form

NC-2009 EAc6:Green power
posted by  Elizabeth Eason  on 

Is the exemplary performance point still available? The new form v6 does not have the option for selecting exemplary performance.

4
Wed Sep 11, 2019, 5:12 pm

Remove Process Equipment?

NC-v4 EAc7:Green power and carbon offsets
posted by  RDK E&S  on 

I'm working on a manufacturing facility that is attempting to achieve this credit. Are process or any other loads eligible to excluded from the total energy consumption for estimates?

1
Wed Sep 11, 2019, 4:54 pm
7
Wed Sep 11, 2019, 3:31 pm
2
Wed Sep 11, 2019, 1:43 pm

Supporting Youth Climate Strike Sept 20

Green Commons
posted by  Michelle Amt  on 

Hi everyone, on our SDL Regional Leaders call today we touched on how different offices are engaging with the Youth Climate Strike on Sept 20, and I offered to share a few resources that we've deve

3
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Wed Sep 11, 2019, 10:52 am

Certified Wood Imported and Installed by Supplier/Subcontractor without COC

CS-2009 MRc6:Certified Wood
posted by  Mario S.  on 

I have a project for which the wood importer and subcontractor does not have a COC certificate.

1
Fri Sep 13, 2019, 12:04 am