Log in
Forum » CS-v4 EQc4
Loading...
Topic

Revit Insight software for daylight stimulation

CS-v4 EQc4: Daylight
posted by Shefali Shah on Feb 12, 2019, 6:39 pm

We are using Revit Insight software for daylight stimulation for (V4.1) option 1

Insight has built in settings for LEED daylight credits, Do we have to model blinds in the Revit model to...

Tenants installing glare control devices

CS-v4 EQc4: Daylight
posted by Ricardo Sá on Jan 29, 2019, 10:27 am

According to Reference Guide, manual or automatic (with manual override) glare-control devices shall be provided for all regularly occupied spaces in order to comply with credit requirements....

Exclusions from Regularly Occupied Spaces for Lab Spaces

CS-v4 EQc4: Daylight
posted by Jordan Daniels on Jun 6, 2018, 7:34 pm

I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor). In these spaces...

Last reply: TODD REED, Jun 7, 2018, 9:23 am

Excluding reuglarly occupied areas

CS-v4 EQc4: Daylight
posted by Jens Apel on Sep 6, 2017, 2:38 am

I know there is a must in the rating system variations; but is there any chance in C&S to exclude areas that are defined as regularly occupied? There is an unanswered question here on...

Last reply: TODD REED, May 23, 2018, 8:12 am

Sefaira Software for Daylight calculation- sDA and ASE

CS-v4 EQc4: Daylight
posted by Nuttanee Vongveeranonchai on May 18, 2018, 7:42 am

Dear All, 

I found that Sefaira has calculated sDA and...

Last reply: TODD REED, May 18, 2018, 7:57 am

New FAQ added on using Revit

CS-v4 EQc4: Daylight
posted by Paula Melton on Apr 11, 2018, 12:25 pm

We've added a new Frequently Asked Question on this credit: Can I use Revit to document this credit?

Measurement Option

CS-v4 EQc4: Daylight
posted by Leilanie Bruce on Feb 26, 2018, 6:29 pm

Is it possible to do the measurement option for a core and shell project where the tenant is occupying 100% of the space? It's listed as an option in the reference guide but in reading the...

Last reply: Paula Melton, Mar 6, 2018, 1:50 pm

Option 1 Skylights

CS-v4 EQc4: Daylight
posted by Edna Urias on Aug 5, 2017, 3:28 pm

We are installing polycarbonate skylights on an industrial plant Core & Shell project. In order to comply with Option 1, i noticed it requires blinds as glazing elements to be installed,...

Atrium with reception desk

CS-v4 EQc4: Daylight
posted by Martin K on May 31, 2017, 9:00 am

Hi,

can someone help me please with these questions?

1) we have an atrium space with a reception desk in the middle. According to the space matrix for LEED v2009 and definition of...

Circulation space around the building core

CS-v4 EQc4: Daylight
posted by Julien Richard on Nov 25, 2015, 4:52 am

For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “.
However, for high-rise office...