Wall Skirting - or - Baseboards

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Blanca Cespedes  on 

I have a vinyl baseboard, does it also have to be Floorscore? Thanks,

0

Adding carpet to LEED Platinum NC building

General forums
posted by  Alireza Anvari  on 

Hi, I'm new here and new in LEED, I apologize for my ignorance. I work as a PM in a LEED Platinum NC building. We are planning to install carpet in the top floor hall way.

1
Thu Feb 26, 2015, 7:00 pm

government areas

NC-2009 SSc2:Development Density and Community Connectivity
posted by  patricia vasconcellos  on 

I have a project that is in a government area. A region of the city that has been set aside to house all the public departments.

1
Fri Feb 27, 2015, 5:35 pm

Owner installed lighitng

CI-2009 EAp2:Minimum Energy Performance
posted by  Allen Cornett  on 

I am trying to find out if a building owner is installing new lighting in a space, will a future tenant be able to included the existing lighting in the lighting power density calculations for EAp2

1
Fri Feb 27, 2015, 2:01 pm

Task light process load or lighting load?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I saw some people say task light is process load but sometimes it can be count into lighting power. I wonder is there a good way to treat task light?

1
Fri Feb 27, 2015, 6:16 am

Option 3: Determining HC and NOx emissions

EBOM-v4 SSc5:Site management
posted by  Michelle Raigosa  on 

Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?

1
Fri Feb 27, 2015, 4:30 pm

Information on denied credits?

General forums
posted by  Stephen Buonopane  on 

Has USGBC/GBCI ever published any studies of denied credits? Typical total number for a project?

1
Thu Mar 12, 2015, 7:00 pm

3 glazed panels - LEEDv2009

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  LEED Pro Consultant  on 

Hello, We have a layout configuration in which working spaces (offices) have glazed panels, allowing views to the exterior through other spaces that include also glazed panels.

1
Fri Feb 27, 2015, 7:23 pm

LEED boundary for a railway station

NC-2009 PIf1:Minimum Program Requirements
posted by  Juan Sergio Simborio  on 

LEED NC 2009 Our project is a major railway station in Qatar.

1
Thu Dec 19, 2024, 4:28 am

WEP1 for A project in Middle East

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ayda Sahaf  on 

The project I am working on is an office building located in middle east. the Washroom water closets all has water jets or a bun gun fixture for washing purpose instead of using toilet paper.

1