Commissioning of PV system by different commissioning agent

NC-2009 EAc2:On-Site Renewable Energy
posted by  Deborah Lucking  on 

We have had this question come up a few times - the owner and the PV system supplier believe that it can be commissioned by a different commissioning agent.

1
Mon May 1, 2017, 1:06 pm

RE: Would we exclude interior walls that were never permitted?

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Diane Hale CHMM, CDGP, CEM, CESCO  on 

We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant.

1
Mon May 1, 2017, 4:00 pm

New O & M Starter Kit IN Credits

NC-2009 IDc1:Innovation in Design
posted by  Kristen Callori  on 

Hello- Now that these new O & M Starter Kit IN credits are available, and they require that (2) O&M Prerequisite Plans be implemented (such as Green Cleaning + Integrated Pest Management) i

1
Fri Dec 1, 2017, 12:24 am

Separate Changing and Shower Rooms

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Tee Howard  on 

I would like to clarify the LEED V2009 requirement for Showers and Changing Rooms.

1
Wed May 3, 2017, 4:37 pm

Entryway Systems Location

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Tee Howard  on 

Context: The vestibule of our commercial building has entry/exit portals; but only leads users to an unenclosed (shell-like, meaning walls on two sides and two big openings to pass thru, and a trel

1
Sat Aug 26, 2017, 8:44 pm

ROCKY SOIL

NC-v4 SSc2:Site development - protect or restore habitat
posted by  soha yamani  on 

in case of rocky soil , limestone precisely in desert area , what kind of restoration should be done ?

1
Mon Aug 28, 2017, 6:37 pm

Add row to purchasing calculator

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Mihir Parikh  on 

I'm trying to add a data row to the calculator and it seems to be locked and requires a password. Is there any way to add in a row to the calculator?

1
Thu Jun 1, 2017, 12:25 pm

Condenser water

CS-v4 EAc3:Advanced energy metering
posted by  MKK LEED  on 

Hi, We are providing condenser water to the floors of a core and shell building for tenant installed heat pumps throughout.

1
Mon Aug 28, 2017, 1:45 pm

Building and Material Reuse

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Edgar Arevalo  on 

I'm selecting Option 3 for building and material reuse.

1
Sat Aug 26, 2017, 12:04 pm

Concrete and Asphalt from Demolition

NC-v4 MRc5:Construction and demolition waste management
posted by  James Keohane  on 

What is the best way to include demolition materials such as concrete and asphalt in CWM calculation?

1
Mon May 8, 2017, 4:54 pm