Energy Star Related Product

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  Wei Zeng  on 

Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling

1
Wed Oct 26, 2016, 9:58 pm

n/a

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Maria Rios  on 

Hey, We are trying to prepare all documentation to get this credit, and we are having some difficulties due to the next consideration: "Plan(s) and/or elevation(s) depicting the location of all m

1
Tue Aug 23, 2016, 4:06 pm

Commercial Interior; EAc1.3

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Marcus, Could you please advice me about the following situation: Regarding Option 1 of credit EAc1.3 of CI, the reviewers are requesting an extra CO2 sensor to be added for the densely occupied

1
Tue Aug 16, 2016, 4:02 pm

Site adjacent to 5 lane highway - with no On-0ff ramp.

Warehouses-NC-v4 LTc4:Surrounding density and diverse uses
posted by  Joyce Kelly  on 

If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a highway for the purpo

1
Tue Jan 17, 2017, 9:25 pm

A shared storm water tank with other projects

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Francesco Allaix  on 

I have a LEED project where they plan a storm water tank that will be a shared one with two other buildings next to the LEED project building.

1
Thu Jan 19, 2017, 5:52 pm

Double Ridership - access to transit station

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Erin Holdenried  on 

If a bus servicing your LEED project connects to a bus transfer station (within 2 miles/10 min) of the project site.

1
Wed Aug 17, 2016, 4:49 pm

Calculating stored rainwater available

NC-2009 WEc3:Water Use Reduction
posted by  Yusuf Turab  on 

We are having some trouble coming up with the calculation for rainwater stored and reused annually.

0

cottages on poles on water

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Emmanuel Pauwels  on 

We are looking into the possibility to certify a holiday resort located on an island.

1
Mon Jan 16, 2017, 2:31 am

Approach for documentation with 2 Commissioning Agents

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Aishwarya Balagopal  on 

The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.

1
Mon Aug 15, 2016, 9:44 pm

160815 FLUSH-OUT - LEED V4 IAQ ASSESSMENT PRACTICE EXAM QUESTION

CS-v4 SSc7:Tenant design and construction guidelines
posted by  P Beulah  on 

Please read the query below and explain if I've misunderstood something. The Reference Guidance book clearly states: Option 1 Flush-Out Path 1 Before Occupancy: Total 14,000 cubic ft of outdoor ai

1
Mon Jan 23, 2017, 8:18 pm