Retail-CI-v2009 EAp2:Minimum energy performanceposted by Wei Zeng on
Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling
n/a
Pilot-Credits SSpc55:Bird collision deterrenceposted by Maria Rios on
Hey, We are trying to prepare all documentation to get this credit, and we are having some difficulties due to the next consideration: "Plan(s) and/or elevation(s) depicting the location of all m
Commercial Interior; EAc1.3
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Marcus, Could you please advice me about the following situation: Regarding Option 1 of credit EAc1.3 of CI, the reviewers are requesting an extra CO2 sensor to be added for the densely occupied
Site adjacent to 5 lane highway - with no On-0ff ramp.
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Joyce Kelly on
If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a highway for the purpo
A shared storm water tank with other projects
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Francesco Allaix on
I have a LEED project where they plan a storm water tank that will be a shared one with two other buildings next to the LEED project building.
Double Ridership - access to transit station
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Erin Holdenried on
If a bus servicing your LEED project connects to a bus transfer station (within 2 miles/10 min) of the project site.
Calculating stored rainwater available
NC-2009 WEc3:Water Use Reductionposted by Yusuf Turab on
We are having some trouble coming up with the calculation for rainwater stored and reused annually.
cottages on poles on water
NC-v4 MPR1:Must be in a permanent location on existing landposted by Emmanuel Pauwels on
We are looking into the possibility to certify a holiday resort located on an island.
Approach for documentation with 2 Commissioning Agents
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Aishwarya Balagopal on
The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.
160815 FLUSH-OUT - LEED V4 IAQ ASSESSMENT PRACTICE EXAM QUESTION
CS-v4 SSc7:Tenant design and construction guidelinesposted by P Beulah on
Please read the query below and explain if I've misunderstood something. The Reference Guidance book clearly states: Option 1 Flush-Out Path 1 Before Occupancy: Total 14,000 cubic ft of outdoor ai