Zero-lot line boundaryNC-v4 WEp1: Outdoor water use reductionposted by Lise Dannesboe on Sep 19, 2018, 9:08 am
Hi One of my LEED project are situated in a MAster Site and the actual certified building will have a zero-lot line. Does this mean that the only vegetation we should count towards this... Last reply: Deborah Lucking, Sep 3, 2019, 11:45 am |
|
we c1NC-v4 WEp1: Outdoor water use reductionposted by Maria Peralta on Jul 24, 2019, 10:18 am
Hello! I have an enquiry regarding this credit. The LEED guide says that food gardens may be include or exclude in the calculations at the project team discretion. So if I... Last reply: Trista Brown, Jul 28, 2019, 9:21 pm |
|
ETo calculationNC-v4 WEp1: Outdoor water use reductionposted by Andrea Valentini on Apr 8, 2019, 12:27 pm
Hi all, I'm working on a project outside of the US, therefore I am using the international version of the WaterSense Water Budget Tool downloaded from the USGBC website. In order to... Last reply: Jens Apel, Apr 9, 2019, 2:18 am |
|
Do water features need to be included in calculations?NC-v4 WEp1: Outdoor water use reductionposted by Cindy Quinn on Mar 5, 2019, 2:45 pm
I have a project that will have a water feature which will be a splash pad during most of the year and an ice rink for 6 weeks in the winter. How do I account for this in the Outdoor Water Use... Last reply: Tristan Roberts, Mar 5, 2019, 4:47 pm |
|
green building- LEEDNC-v4 WEp1: Outdoor water use reductionposted by saeed kazemi on Aug 1, 2018, 4:29 am
hello every body. is there any one here that knows what are the questions that i should ask to analyse a building to know is it green or not ? i am using LEED guideline and for example in... Last reply: Dustin Norton, Dec 19, 2018, 2:25 pm |
|
rainwater recovery at inside boundary, store at outside boundary, Can it be used as a calculation of potable water reduction?NC-v4 WEp1: Outdoor water use reductionposted by Ray Hsing Chen on Oct 1, 2018, 3:37 amPaula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 183 thumbs up December 18, 2018- 11:29 am Hi, Ray! In this prerequisite, the use of rainwater does not come into play. Can you please re-post your question in this forum about the credit? Then I will see if the credit expert can answer this tricky question. Log in or register to post comments ... Last reply: Paula Melton, Dec 18, 2018, 11:29 am |
|
Existing irrigated treesNC-v4 WEp1: Outdoor water use reductionposted by Megan Leslie on Nov 30, 2018, 3:14 pm
I am wondering if existing irrigated trees on a university campus that are included in our LEED boundary need to be included in the calculations for Outdoor Water Use Reduction prerequisite/... Last reply: Tristan Roberts, Dec 4, 2018, 8:11 pm |
|
LEED v4 Outdoor Water Use Reduction CalculatorNC-v4 WEp1: Outdoor water use reductionposted by Clara Pistoni on May 6, 2016, 12:03 pm
Hi All, Last reply: saeed kazemi, Aug 4, 2018, 2:40 am |
|
Irrigation controller- WaterSenseNC-v4 WEp1: Outdoor water use reductionposted by Ricardo Sá on Dec 15, 2017, 8:14 am
Dear All, Our project is located in Portugal and the project team is intendend to install a WaterSense irrigation controller. However, on a contact with Rainbird Supplier, the... Last reply: Ben Stanley, Jan 15, 2018, 5:39 pm |
|
Complience Path 1 (Prescriptive Achievment) in Watersense unlisted regionsNC-v4 WEp1: Outdoor water use reductionposted by Guillermo Brunzini on Nov 8, 2017, 3:15 pmCalie Gihl Design Engineer LEEDuser Expert 19 thumbs up November 26, 2017- 7:31 pm Hi Guillermo, I believe your question is referring to WEp2, although you posted it in the p1 forum. I will answer it from the perspective of Indoor Water Use Reduction prerequisite 2. If you are outside of the US, you may use a local equivalent to WaterSense. You can find USGBC's approved alternatives here: https://www.usgbc.org/resources/international-water-labeling-programs Log in or register to post comments ... Last reply: Calie Gihl, Nov 26, 2017, 7:31 pm |