Forum quick links
Enhanced Refrigerant Management Query
EBOM-v4 EAc8:Enhanced refrigerant managementposted by padma priya on
We have a VAM Chiller, and we indicated "none" as the refrigerant type because in VAM chillers, water serves as the refrigerant, resulting in zero OWP and GWP.
Lighting Zone for a Terminal Building
NC-v4 SSc6:Light pollution reductionposted by Gustavo De las Heras Izquierdo on
Hello,
100% nonportable water for cooling tower
NC-v4 WEc3:Cooling tower water useposted by Thomas Tran on
Hi,
LEED reference document says in the Required document Table (page 309):
Partial Floor LEED Certification
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified. The project space is approximately 52% - 60% of the total floor
Existing PV on previously certified project
NC-v4 EAc5:Renewable energy productionposted by Yu Zhang on
I have a project that is a new building located on a previous certified LEED project with PV production. The previous project had >90% offset by energy use and >100% offset by cost from
Location Valuation Factor
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Shannon Oletic on
Hello,
LEED Communities - non-contiguous land included
ND-v4 MPR2:Must use reasonable LEED boundariesposted by Lidia Johansen on
Dear All
50% surface area reuse
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Mark Ragucci on
how is this credit calculated? can in include existing floor slab and deck? we are leaving a portion of the exiting walls that are about 20ft tall and our ceilings will be at 9'.
Backup Documentation
NC-v4 WEc4:Water meteringposted by Michelle Rosenberger on
It seems that many credits no longer ask for any backup to be uploaded. Including this one. This lack makes us uncomfortable because we've always uploaded plans sheets.