Topic | Recent |
---|---|
Proof on Exceptional Calculations of Energy ModellingCS-2009 EAp2: Minimum Energy Performanceposted by Kathy Wong on Jan 7, 2019, 2:13 am
Our LEED project has adopted lighting control as energy-saving strategy for parking garage and documented as exceptional calculation in EAp2 and EAc1. Soon we received USGBC's comment asking for... Last reply: Kathy Wong, Jan 8, 2019, 4:48 am |
|
(Sample) Lease AgreementCS-2009 EAp2: Minimum Energy Performanceposted by Charalampos Giannikopoulos on Feb 15, 2015, 11:33 am
If no tenants have been identified can the project owner claim relevant energy saving from reduced lighting power... Last reply: Marcus Sheffer, Dec 20, 2018, 5:10 pm |
|
LPD for covered (open) mechanical roomCS-2009 EAp2: Minimum Energy Performanceposted by Jorge Lopez de Obeso on Nov 21, 2018, 5:22 pm
We're working on an energy modeling configuration and filling the Section 1.4 Table: The project includes a mechanical room on the roof floor which is not entirely unclosed, it has a steel deck... Last reply: Marcus Sheffer, Nov 23, 2018, 1:21 pm |
|
Tenants HVAC System TypeCS-2009 EAp2: Minimum Energy Performanceposted by Amgad Khattab on Aug 31, 2011, 9:26 am
We are modeling a Core & Shell office building where the HVAC system is in the tenant scope. we are only delivering chilled water and outdoor air to the tenant areas. We are specifying fan... Last reply: Marcus Sheffer, Oct 24, 2018, 10:44 am |
|
Modeling a DOAS Serving Shell SpaceCS-2009 EAp2: Minimum Energy Performanceposted by Cory Duggin on Sep 5, 2018, 12:56 pm
We have a fully designed DOAS that provides ventilation to the core and shell spaces of the building. Since the DOAS is fully designed, can we have it provide the ventilation to the shell spaces... Last reply: Cory Duggin, Sep 7, 2018, 12:11 pm |
|
Thermal zones split and AHU serving themCS-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Aug 17, 2018, 6:04 am
Greetings, The project we are modeling is an office building Core and Shell type with a Г shape. It consists of large office zones, as they will be later subdivided to the future tenants... Last reply: Marcus Sheffer, Aug 17, 2018, 10:04 am |
|
Fan controlCS-2009 EAp2: Minimum Energy Performanceposted by Jorge Lopez de Obeso on Aug 14, 2018, 2:06 pm
I'm working on a project where the building owner is going to provide several Fan&Coil units, the fan control of these units has 4 different presets of velocity being: super high, high,... Last reply: Marcus Sheffer, Aug 15, 2018, 11:01 am |
|
LEED Campus: exterior lightingCS-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Aug 10, 2018, 11:48 am
The building I am modeling is part of a campus. The LEED boundaries of the single buildings are coincident with the buildings while the exterior spaces are inside the LEED Campus boundary. How... Last reply: Marcus Sheffer, Aug 10, 2018, 12:05 pm |
|
exterior lighting: roofCS-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Aug 10, 2018, 3:35 am
Hello, is exterior lighting on a roof (terrace) regulated by ASHRAE 90.1-2007? Or shall it be modelled in the same way (same power and same schedules) in the proposed and in the baseline model... Last reply: Marcus Sheffer, Aug 10, 2018, 12:00 pm |
|
Energy modeling ACPCS-2009 EAp2: Minimum Energy Performanceposted by Gabriela Mena on Jul 12, 2018, 11:37 am
Hi, We have a CS project- Office building of 16 levels. To achieve minimum energy performance and optimize energy performance we are applying the ACP. The HVAC cooling system consist in... Last reply: Marcus Sheffer, Jul 12, 2018, 11:57 am |