What constitutes a building entrance?

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Carolyn Day on Aug 21, 2015, 9:31 am

We are working on a tenant fit-up on the 8th floor of a downtown building which sits on a corner. The first floor has several retail establishments with direct street access. From what I can...

Core&Shell Inheritance

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Redy Truccolo on Mar 18, 2015, 11:11 am

Hi everybody,

I have a CS2009 certified project and now I'm working on its CI2009 certification, which will be applied to the whole building area (there is only one tenant).
My...

Non-Smoking Policy

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Erika Duran on Feb 20, 2015, 4:03 pm

Dear All,
I have a hotel project that has a non smoking policy for the entire hotel. Do you know if there are any exceptions for the Door Blower Testing in such a case for LEED or is it a...

Minimum and average negative pressure measurements

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Bilge Ceylan on Nov 12, 2014, 6:17 am

In our project, the design pressure is well above the minimum required negative pressure in our smoking rooms with respect to the adjacent areas. However, in the related LEED form, there are two...

No Smoking Campus Policy

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Kristina Abrams on Jul 14, 2014, 11:22 am

We have a new building on a No Smoking Campus. The policy is posted on the University website, and signage is posted around campus and within buildings. Is the project required to provide...

Last reply: Akos Brandecker, Jul 21, 2014, 11:23 am

smoking signage

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by yukari kubo on May 29, 2014, 11:01 am

I am working on the new construction of a campus (non school). At the entry into the campus, there is a posted sign stating no smoking. There is however a designated smoking area inside the...

Last reply: Noriko Nagazumi, Jun 2, 2014, 11:48 pm

Project on 7th floor

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Mike D on Sep 27, 2013, 4:24 am

If the LEED CI project is located on the 7th floor of a building, do we still need to provide non-smoking signs on the ground floor?
There is no smoking allowed in the building following...

Prerequisite Denied

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Ellen Mitchell on Oct 21, 2011, 4:14 pm

This issue seemed to be in question on a few other posts so I thought I would weigh in on a recent experience. I currently have a CI project that is located atop a highrise building in Atlanta -...

Last reply: Ellen Mitchell, Nov 7, 2011, 11:06 am

No smoking rooms in tenant space

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Adam Targowski on Oct 20, 2011, 10:39 am

There is a building where somking is allowed and there are some rooms designated for somoking but they are all outside the tenant space so they are not in the project scope of work. In that case...

Last reply: Adam Targowski, Oct 21, 2011, 5:56 am

USGBC/ GBCI Alt Path for Environmental Tobacco Smoke

CI-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by LUCY WILLIAMS on Dec 20, 2010, 4:31 pm

I am currently working on a project that intends to pursue LEED certification. We have run the checklist, and 58 points have fallen into place. Unfortunately, the landlord of the building...

Last reply: Rubén M. R., Sep 12, 2011, 6:24 pm