Forum quick links
Is drywall considered a demountable feature?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Andrea Tayah Esperão Malta de Campos on
I am working on a project for a commercial interior planning under ID+C certification that opted mainly for an open space plan but in certains areas there are some drywalls to convey priv
Kitchen Equipment - threshold for 1pt credit
Schools-NC-v4.1 WEp2:Indoor Water Use Reductionposted by Jeremy Theodore on
We have a school in design achieving 40% to 45% reduction thus 4 to 5 points for Indoor Water Use Reduction per the LEED v4.1 guide. If it achieves at least 40% (antiicpated) it would then ac
Exemplary Performance for CS
CS-v4.1 EAc5:Renewable Energyposted by Sofia Barahona on
What it the percentage of renewable energy needed for Core and Shell for exemplar performance?
Option 2 IAQ Testing
NC-v4 EQc4:Indoor air quality assessmentposted by Robert Cashins on
Are there guidelines on how to determine how many air samples need to be collected to comply with the IAQ Assessment requirement?
Are all spaces outside the 3x head height excluded?
NC-v4.1 EQc8:Quality Viewsposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
I realize this is most likely quite a basic question, but in V4.1 are allowable quality view areas only for those regularly occupied spaces within the 3x head height zone and all others do not coun
Pressurized entryway vestibules at high-volume building entrances
Healthcare-v4 EQc1:Enhanced indoor air quality strategiesposted by Priscillia Champagne on
Hi, I would like to know if there is additional guidance on the requirement to provide pressurized entryway vestibules at high-volume building entrances.
Heat Island Reduction
NC-v4 SSc5:Heat island reductionposted by Jose Castorena on
In this credit under option 1 the standard formula includes a vegetated roof.
Flush-out option preferred, but some furniture delivery delayed
NC-v4 EQc4:Indoor air quality assessmentposted by Erica Downs on
The project contractor intends to do a full flush-out prior to occupancy. Most of the furniture will be installed prior to flush-out, but on particular oder has been delayed and may not arriv
Permeable Paving - "vegetated open space"
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Lauren Sparandara on
If our permeable paving has grass growing through it could that count as both hardscape for SSc7.1 and for vegetated open space in SSc5.2?
District cold storage project
NC-v4 EAp2:Minimum energy performanceposted by Ryan Wang on
Hi all experts,