Forum quick links
balconies and heat island reduction
CS-v4 SSc5:Heat island reductionposted by Sareet Benayahu on
hello, our project has a large balcony on the second floor of the building.
Option 2: Provide Backup Power for critical loads (1 point) - Back-Up Power Time Duration Table 1.
Pilot-Credits IPpc100:Passive Survivability and Back-up Power During Disruptionsposted by Dionisio Franca on
Back-up power time duration table 1 divides facilities in three categories:
Baseline systems exception: A system for the kitchen in all electricity heating source
NC-v4 EAc2:Optimize energy performanceposted by Mohamed Elagiry on
if we have system 6 as The main system which has the electricity as the main heating source, we have an exception for the kitchen according to G3.1.1 b which state to use system 5 or 7 for the
Condo Building with EXTREMELY small units - around 400 sf
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Stacy Smedley on
We are performing blower door tests on a condo project with units as small as 400 sf.
Integrative process charrette and ANSI book
NC-v4 IPc1:Integrative processposted by Kavita K on
Hi all,
We are pursuing a LEED for Schools project and are looking to get the Integrative process credit. Couple of clarifying questions -
Sky garden in refuge floor
CS-v4 SSc2:Site development - protect or restore habitatposted by Yoyo Shek on
Hi All,
surrounding density
CS-v4 LTc4:Surrounding density and diverse usesposted by Hatice G. on
Dear all,
how can I figure out the surrounding density?