Forum quick links
Baseline hot water generation
NC-2009 EAp2:Minimum energy performanceposted by Ciaran McCabe on
The Design Preliminary Review has been completed on one of my projects and we have one query from EAp2 which appears unclear.
LEED Certification for Mixed-Use Office and Residential
CS-v4 MPR3:Must comply with project size requirementsposted by Van Jomel Garcia on
We have a project composed 60 floors, 1st-40th floor is office (12-40 floors leasable) and 41st-60th floor will be residential. In relation to the subject above, is it also possible to pu
Project relocated to a new site
NC-v4 IPc1:Integrative processposted by Sara Goenner Curlee on
I have a project that just completed the IP credit requirements before the end of SD, and now finds itself likely needing to relocate to a different site. The proposed new site is about 1
Steel- Default of 25% post-consumer content
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Jutta Berns on
If someone could please confirm whether the following guidance from the LEED v4 Reference Guide is still applicable to LEED v4.1 projects: "Default recycled content for steel products where no
ID+C Retail -- Dishwasher requirements for WEp1
CI-v4 WEp1:Indoor water use reductionposted by BEE Incorporations on
A retail space inside a mall is exploring to purchase a dishwasher. This dishwasher will be used by the limited store employees only twice a day.
EV Ready - Raceway
NC-v4.1 LTc8:Electric Vehiclesposted by Jill Kurtz on
We have a project that is seeking certification. It shares parking with existing buildings on its campus.
unmet load hours
CS-2009 EAc1:Optimize energy performanceposted by Elisabetta Annoni on
Hi, for the unmet load hours test there is a throttling range to be defined. As I understand from ASHRAE 90.1 there is no fixed value for this range, how shuold it be defined?
Touch ups
NC-v4.1 EQc2:Low-Emitting Materialsposted by Summer Gorder on
If a product is applied off-site by the manufacturer, but there is a possibility for "touch-up." Do those "touch-ups" need to meet the requirements for VOC and emissions?
Can warehouses do regular EV options?
Warehouses-NC-v4 LTc8:Green vehiclesposted by Joseph Snider on
Does anybody know if pursuing the Warehouse option, if we HAVE to use the warehouse criteria? For example, could we meet this credit in the traditional manner, or do we have to do one of the
Modular Units
NC-v4 EQc2:Low-emitting materialsposted by Brightworks Sustainability on
I'm working on a hotel project where the guest room units will be built modularly off site. How does this affect the LEM credits?