I am simulating a hotel building. Domestic hot water requirement will be contributed by solar powered calorifier. Electric hot water system will be provided for back up. Is it fine if I neglect the back up electrical system, and show 100% savings from solar powered water heating system. Will that be acceptable to LEED reviewer. If not, kindly advise me how to model electrical back up water heating system.