Forum quick links
Pool area within natatoriums excluded?
NC-v4 EQc8:Quality viewsposted by Lyle Axelarris on
Does anyone know if pool decks and splash pad areas in an Aquatics Facility are exempted from this credit (similar to the exemption for gyms)?
Thermal Comfort - Thermally-controlled office chairs and wearables (bracelet)
CI-v4.1 EQc5:Thermal Comfortposted by Sara Wing on
Regarding precedents for IEQ: Thermal Comfort Credit (namely, Radiant Thermal Comfort Control):
Natural ventilation room by room calculation
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Agustin Bertolotti on
Hi everyone
Roadways materials
NC-v4 SSc4:Rainwater managementposted by Dina El-Sady on
Which would be better for this credit , a normal porous asphalt paving or a vegetated interlock ?
EQp2
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Alice Andersen on
Hi LEEDuser
I have two questions:
Anti-Ligature Plumbing Fixtures
Healthcare-v4 WEp2:Indoor water use reductionposted by Bethany Beers on
Hello, has anyone had an success getting an exemption or exclusion on the WaterSense requirements for anti-liguature fixtures in an in-patient mental health facility?
"ready for review" status in Design Final Review Decision
CS-2009 IDc2:LEED Accredited Professionalposted by sofia la cognata on
Good Morning,
Zone Isolation in Hotels
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Biophilic Design: Quantifiable Metrics
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by LEED Team DC on
Hi, I'm wondering if there are shareable examples of a project team documenting quantifiable biophilic metrics.