Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Commercial Ice Machines Equivalent

NC-v4 WEp2:Indoor water use reduction
posted by  Summer Minchew  on 

LEED reference guide states for Ice machines "ENERGY STAR or performance equivalent." Does anyone know if 2018 DOE (Department of Energy) regulations would be an acceptable performance equival

3
Fri Nov 19, 2021, 2:49 pm

AEDG For Big Box Retail in a 34000 Sq. foot Auto Dealership

NC-v4 EAp2:Minimum energy performance
posted by  Robert Fernandez  on 

I have a proposed project implementing a CV system that meets Title 24 2019 in California but I think we can get more points if I used the AEDG presciptive path in lieu of an energy model.

1
Wed Nov 17, 2021, 7:56 pm

Shower Facilities on College Campuses

NC-v4.1 LTc6:Bicycle Facilities
posted by  Theresa Lehman  on 

The college is building a new engineering building on campus.

1
Wed Nov 17, 2021, 8:37 pm
2
Wed Nov 17, 2021, 3:27 pm

adjacent spaces outside scope of work?

CI-v4 EQc9:Acoustic performance
posted by  Erin Holdenried  on 

For LEED projects that consist of tenant space within a larger building, do they have to consider adjacencies to spaces outside the scope of work?  

1
Thu Feb 3, 2022, 10:24 pm

Low Speed High Volume Fans - Penalty in model for using?

NC-v4 EAp2:Minimum energy performance
posted by  Donald Green  on 

We are partnering with our local energy company for an energy model as this service will provide anlaysis and incenteive back to the Owner. The project is using several low spee

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Nov 16, 2021, 7:29 pm

Commissioning of existing equipment not in scope?

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Brian Salazar  on 

Hi all!  We received feedback from the LEED review team on Cx that I had not seen before.  We have a Core & Shell building where the exisitng Domestic Hot Water heater was retained.

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Nov 16, 2021, 4:51 pm

Health and Safety Specialist requirement

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Shanwen Hsu  on 

Do we need to provide Ergonomist/ Health and Safety Specialist's bio or prove of credentials? 

2
Opsis Architecture
LEEDuser Premium Member
14 thumbs up
Mon Nov 15, 2021, 8:58 pm