DESIGN AND CONSTRUCTION PRELIMINARY REVIEW
CI-v4 EAc2:Optimize energy performanceposted by Zixuan Yuan on
Excuse me, in the supply airflow rate part, it is required that the airflow should be approximately 1 cfm/square feet for the office buildings.
What are Division 1 general requirements of the project specifications
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Ayman Raouf on
Can someone explain to me what are Division 1 general requirements of the project specifications?
Here are some extracts I can read:
electric vehicles and reduced parking footprint?
NC-v4.1 LTc8:Electric Vehiclesposted by Craig Flandermeyer on
Is there a way in v4.1 to use these two credits in tandem? V4 has some guidance that increases percentages if both are used. Curious if anyone has attempted both.
Bird Collision Deterrence – Performance Monitoring Plan
NC-v4 INc1:Innovationposted by Verde Design on
I am currently developing a performance monitoring plan for the Bird Collision Deterrence Pilot Credit and have a couple of questions:
No smoking sign within college campus
NC-v4 EQp2:Environmental tobacco smoke controlposted by Eric Carbonnier on
I am working on a LEED v4 NC project which is a department within a college campus.
Buildable Land - State and Fed-owned?
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Rachel Williams on
Hello,
EA prerequisite and Option 2. Prescriptive compliance: ASHRAE 50% Advanced Energy Design Guide for Warehouses
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Carine HUANG on
Hello,
I'm currently working on a warehouse house project. We are following the Option 2. Prescriptive compliance: ASHRAE 50% Advanced Energy Design Guide.
Comprehensive Composting
NC-v4 INc1:Innovationposted by Alma Evans on
Hi there, I registered the project I worked on in Austin, TX - Govalle Elementary School for the comprehensive composting pilot innovation point and I want to thank AISD for providing the requ
HVAC System Size
Pilot-Credits EApc66:Community contaminant prevention - airborne releasesposted by Aaron McEwin on
Rule 1111 (Amended July 8, 1983), NOx Emissions from Natural-Gas-Fired, FanType Central Furnaces limits system sizes to 65,000 Btu/h cooling and 175,000 Btu/h. Can projects that have systems large