Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

IEQ 6.2 Controllability of Systems - Thermal Comfort

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Sandra Holmström  on 

Hi! I have a Core & Shell project that is a commercial mall. Is this credit eligible at all for these type of building?

3
Tue Sep 4, 2012, 7:07 pm

Appendix G - Type of system

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt related to the type of system I should consider in a specific case. I'm working on a project where most of the bulding is served by one type of system.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 4, 2012, 5:56 pm

Loading docks in the attached garage?

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Elizabeth Crenshaw Hammitt   on 

Hello everyone, I just read in the LEED EBOM submittal tips that teams should note that mats are required at loading dock entrances and at entrances from attached garages; this is also noted above

2
Tue Sep 4, 2012, 5:38 pm

rodent bait blocks vs. paste

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Jutta Berns  on 

the contractor on one of our project is requesting to use a first-generation rodenticide which is supplied in a solid paste form, packaged in individual sachets (not pellets), rather than in a bloc

2
Sustainability Professional
LEEDuser Expert
430 thumbs up
Tue Sep 4, 2012, 5:30 pm

Multiple AHU from shared OA

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Wayne Mason  on 

I have a situation where a mechanical room (4 actually) has two SCU units and one OA inlet.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Sep 4, 2012, 4:31 pm

FSC Certifier

NC-2009 MRc7:Certified Wood
posted by  Melissa Merryweather  on 

This may be nit-picking and I don't see any place for this information in the submittals, but the manual states that the COC certification must be provided by an FSC-accredited certifier.

2
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Tue Sep 4, 2012, 4:35 am

Proposed smoking area near guard house

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Katherine Ann Resurreccion  on 

The guard house is totally isolated and placed away from the whole building, but is located inside the project boundary. The proposed smoking area is within 25 feet from the guard house.

3
Tue Sep 4, 2012, 1:03 am

Pot as a green roof

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Alicia Villanueva  on 

My question is regarding what can be considered as a green roof: Is a pot considered as a green roof?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Sep 3, 2012, 3:49 pm

Messages to the reviewing commitee thru LEEDonline

CI-2009 MRc7:Certified Wood
posted by  Caro Wilbanks  on 

If you have submitted a questions using the message system for your project on LEED online to the reviewing committee, how long should you expect it to take to get an answer.

3
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Fri Aug 31, 2012, 8:35 pm

ASHRAE Lighting Compliance Documentation

CI-2009 EAp2:Minimum Energy Performance
posted by  Luis Miguel Diazgranados  on 

Greeting to everyone, For this prerrequisite's form, LEED asks to upload ASHRAE's "Lighting Compliance Documentation".

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Aug 31, 2012, 4:25 pm