no new parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Crina Bosch on
My understanding of this credit's intent is to reduce the impact of automobiles for commuters.
HOV vs. Carpool/Vanpool
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by William Weaver on
This feels like a question in semantics, but I'm going to throw it out there anyway.
Off-site PV array with PV Developer
NC-2009 EAc2:On-Site Renewable Energyposted by Michael Pulaski on
My university client is about to sign a letter of intent for a Net Metering Credit Purchase Agreement with a PV Developer for a 650 kW array.
IEQ Credit 8.2 : Lobby at Community Center/Field Operations
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Claudia Galvis on
I went through the regularly occupied spaces matrix provided in the USGBC website and it does not mention community centers.
CO2 sensors in exhaust air duct
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Mathilda Jonsson on
Hello I know that the CO2 sensors shall be installed in the breathing zone of the spaces.
Method for surveying in an academic setting
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Hil Curtis on
Our building is located on a college campus in a large metropolitan area 5 miles from the downtown core.
Materials Submittal Form
NC-2009 MRc4:Recycled Contentposted by Felipe Martinez on
Hello everyone, Does anyone know where I could find a LEED materials form file for MRc4 and MRc5 credits to send out to all the subcontractors working in the project for them to fill out and retur
Interior renderings not available for project
NC-2009 PIf4:Schedule and Overview Documentsposted by Mark Meaders on
I have a project that has finished design and construction has not started. One of the items that GBCI requests is a photo or rendering of the interior of the building.
Shading from Adjacent buildings
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, When modeling Proposed model for LEED and there are shadings from adjacent buildings in it, should these shading be applied also to the Baseline model or they should be omitted like the
1 year and 2 year 24 hr design storm
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by sona prajapati on
In case 1, we are required to perform a site run off calculation for 1 yr-24 hr design storm and 2 yr-24 hr design storm for both pre- and post- development period.