Forum quick links
On-site CHP Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by MURAT DOĞRU on
Dear all, We are modeling a hospital building which is served by two 800kW CHP systems. The CHP systems are dedicated to this building only, i.e.
Asbestos Remediation
NC-2009 SSc3:Brownfield Redevelopmentposted by Jeannie Rueter on
The first phase of our Job Corps project was to construct a new cafeteria on campus. The second phase is to demolish the old cafeteria. The old cafeteria has asbestos in it.
Water reclaimed wood?
NC-2009 MRc3:Materials Reuseposted by Ilana Judah on
We are looking at a product that is wood reclaimed from dead underwater trees due to flooding in a region.
CI project with no parking
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by CT G on
If a CI project occupies an entire building, but has no parking available for the occupants, would this satisfy the requirements of this credit?
Are filing cabinets included
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Farah A. on
Are filing cabinets included in the calculations for Maintain Interior Nonstructural Elements?
Participant Survey
Pilot-Credits PC14:Walkable Streetsposted by Bryan Finnegan on
The link provided to us for the Pilot Credit Participant Survey only directs to the USGBC homepage. Is there an up to date link for this?
CxA vs supervisor / PM
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Catharina B on
Hi On our project more than 50 000sq Owner hired a Project Manager whose responsibility is to supervise (e.g.
Equipment Efficiency EA Credit 1.3
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ciaran McCabe on
We are trying to document the equipment efficiency for a fit-out we are involved in under Commercial Interiors 2009.
Need your Advise - Urgent (Sports Hall Project)
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi, We are doing Energy Simulation for Sports Hall Project (G+1 Story building). Sports hall having single playing court and it will be used for various sports activities.
Previously developed sites
NC-2009 PIf2:Project Summary Detailsposted by Raquel Torrente on
We have received the review report of the building.