Forum quick links
Table EAp2-5
NC-2009 EAp2:Minimum Energy Performanceposted by Isabel Santos on
Dear all, I am having one difficulty in filling the form of EAp2.
Exterior Lighting not yet designed
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I am modeling a project which still has no exterior lighting design (the owner will decide on this when the building is almost complete). In the preliminary design review, I put the val
District virtual rate:
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have project using district steam. We use DES v2 to calculate the virtual rate based on state averaged electricity (0.084$/kWh) and gas (0.00757$/MBTU).
Air leakage through revolving door
NC-2009 EAp2:Minimum Energy Performanceposted by Claes Engström on
Hi ! According to building envelope compliance documentation Part I, revolvning doors should have air leakage less than 1,0 cfm/ft2. A manufacturer of revolving doors informed me that all revolvin
Solar service hot water system
NC-2009 EAp2:Minimum Energy Performanceposted by Rosana Correa on
Hi, The service water system in this building is heated by solar thermal collectors only, with no secondary heating system.
Roof insulation & suspended ceiling
NC-2009 EAp2:Minimum Energy Performanceposted by Charline SEYTIER on
Hi everyone, We are working on a major renovation project where the owner wants to install roof insulation above the suspended ceiling.
Pressure Drop Adjustment for Lab Buildings
NC-2009 EAp2:Minimum Energy Performanceposted by John Nott on
I am trying to Calculate the required Pressure Drop adjustment for a lab facility, using Addenda "p" from ASHREA 90.1-2007.
Natural Ventilation Savings
NC-2009 EAp2:Minimum Energy Performanceposted by Marcus Sheffer on
I may have helped you, now it's your turn to help us all. The USGBC is seeking input and information related to the modeling of naturally ventilated and naturally conditioned buildings.
multiple buildings energy modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
My project consist of a mixed used tower (G+52 floors) and 2 detached building ( be fed from the same cooling and heating system ) but they are core and shell and I m persuing LEED NC 2009 honestly