FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Minimum Energy performance Calculator

Greetings, We have a project, which is registered upon LEED-NC v2009, with unit type SI. The online form of EAp2 has a new form, which is directing us to upload the Minimum Energy Performance Calculator. This calculator however is for LEEDv4 and if used for LEED 2009, it is to use the ASHRAE 90.1-2010 pathway. The designers have already been informed that they should refer ASHRAE 90.1-2007and the project design is completed. Please advice how to proceed in this case. Thanks

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 01/19/2017 - 15:32

There is a version of the MEPC that is based mostly on 90.1-2007. You have a few choices. 1. You can use the new form with the MEPC. It has SI units as an option so that helps you but it still has some quirks and issues. 2. You can contact GBCI and request that they replace the form in LEED Online with the older v5 form and then use the previous Section 1.4 Tables. 3. You can simply upload the v5 version of the form and the Section 1.4 Tables, however this will not record information correctly in LEED Online and may affect the calculations and documentation of other related credits. The one thing you definitely should not do is use the new form with the old Section 1.4 Tables. This combination will not provide the reviewer with the information they need to evaluate EAp2.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.