Forum quick links
Baseline Fan Power Calculation - Pressure Drop Adjustment
NC-2009 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
Hi All,
Are there any trade off if using the Existing chiller
NC-2009 EAp2:Minimum Energy Performanceposted by sriram tetali on
Hi all,
The project is an industrial buildings
Indoor unit power calculation
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi,
Parking Garage (VFD with CO sensor) exceptional calculation Method
NC-2009 EAp2:Minimum Energy Performanceposted by Manivel Natarajan on
Hi Team,
Greetings!
ICOP AHRI 340/360
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
As for the mandatory provisions according to ASHRAE 90.1-2007, Tab. 6.8.1A refers to ICOP with test procedure AHRI 340/360.
Baseline Design Air Flow - System 5
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
The project we are modeling belongs to System 5. There is however no cooling needed or designed.
30% fresh air allowance over minimum requirements of ASHRAE Standard 62.1
NC-2009 EAp2:Minimum Energy Performanceposted by Kristof Skawinski on
I strongly question this application of minimum 30% more fresh above ASHRAE Standard 62.1 for buildings in hot and humid climates like Colombo in Sri Lanka where designers on specific project insis
Humidity control - "Unmet humidity load hours"
NC-2009 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hi all,
I've been reading some of the previous comments about the humidity controls (both humidification and dehumidification). Am I correct to assume:
Equipment efficiencies / DX Cooling Coil EER and COP
NC-2009 EAp2:Minimum Energy Performanceposted by F S on
Hi all.
Question about ASHRAE 90.1 Baseline equipment efficiencies.Project is using System 5 with a Load of around 400kBtu/h. Table 6.8.1A shows the minimum efficiency to be 9.8
is there a compliance path for multiple baselines?
NC-2009 EAp2:Minimum Energy Performanceposted by Courtney Royal on
Can LEED v2009 projects (which has ASHRAE 90.1-2007 baseline) demonstrate compliance using ASHRAE 90.1-2013? Is there any adjusted point scale which can be applicable for such projects?