LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Nov 14, 2017, 7:30 am

ICOP AHRI 340/360

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

As for the mandatory provisions according to ASHRAE 90.1-2007, Tab. 6.8.1A refers to ICOP with test procedure AHRI 340/360.

0

Baseline Design Air Flow - System 5

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

The project we are modeling belongs to System 5. There is however no cooling needed or designed.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Nov 8, 2017, 7:54 pm

30% fresh air allowance over minimum requirements of ASHRAE Standard 62.1

NC-2009 EAp2:Minimum Energy Performance
posted by  Kristof Skawinski  on 

I strongly question this application of minimum 30% more fresh above ASHRAE Standard 62.1 for buildings in hot and humid climates like Colombo in Sri Lanka where designers on specific project insis

2
Wed Nov 8, 2017, 3:38 pm

Humidity control - "Unmet humidity load hours"

NC-2009 EAp2:Minimum Energy Performance
posted by  Luis Andrade  on 

Hi all,

I've been reading some of the previous comments about the humidity controls (both humidification and dehumidification). Am I correct to assume:

5
Mon Nov 6, 2017, 5:37 pm

Equipment efficiencies / DX Cooling Coil EER and COP

NC-2009 EAp2:Minimum Energy Performance
posted by  F S  on 

Hi all.

Question about ASHRAE 90.1 Baseline equipment efficiencies.Project is using System 5 with a Load of around 400kBtu/h.  Table 6.8.1A shows the minimum efficiency to be 9.8

2
Default Avatar
LEEDuser Basic Member
0 thumbs up
Mon Nov 6, 2017, 6:59 am

is there a compliance path for multiple baselines?

NC-2009 EAp2:Minimum Energy Performance
posted by  Courtney Royal  on 

Can LEED v2009 projects (which has ASHRAE 90.1-2007 baseline) demonstrate compliance using ASHRAE 90.1-2013? Is there any adjusted point scale which can be applicable for such projects?

5