Hi all,
The project is an industrial buildings
The project uses Water cooled Centrifugal chiller which is an existing one and relocated from another country to be fitted for a New industrial Building in India. Are there any trade off in terms of COP as existing COP is 5.8 Further The total HVAC Load is 400 Tonnes, and the chiller capacity 2 no's 300 Tonnes
So in this case kindly advice.
Thanks in advance
Sriram tetali