Forum quick links
Pre-cast concrete structure environmental product declarations
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Maiz Rech on
Considering the building is built of a precast concrete structure that was made of steel and cement and those present environmental procuct declarations, may I use these EPDs to comply wi
Want to consider 30% fresh air in printing areas
CI-v4 EQp1:Minimum indoor air quality performanceposted by Nagaraj Sankar on
DES Owned by A Third Party
NC-v4 EAp4:Fundamental refrigerant managementposted by Candice Rogers on
Hello -
Minimum IAQ Performance calculator
NC-v4 EQp1:Minimum indoor air quality performanceposted by on
Why does the Minimum IAQ Performance calculator excel spreadsheet have a formula to truncate the calculation of the Average outdoor air fraction (Xs) to only 2 digits by rounding down?
Definitions for a lab/office building
NC-v4 LTc7:Reduced parking footprintposted by Maiz Rech on
Hello!
TABLE 1. Default Occupancy Numbers
CS-v4 EQp1:Minimum indoor air quality performanceposted by Oscar Martinez on
Hi, I'm working on a warehouse project in Mexico. The rating system is v4 CS and I have a question in progress.
Advanced metering for cooling and ventilation
NC-v4 EAc3:Advanced energy meteringposted by Dina El-Sady on
How can we separate metering for cooling an ventilation if they are both within the same unit ?
Rainwater Management
NC-v4 SSc4:Rainwater managementposted by Ribert Senzoga on
I am evaluating the Rainwater Management of a warehouse project where the water table is very high and we don't have enough depth to make a water basin.
Baseline Building HVAC systems
CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi,
We are modeling a portion of a building.
The building counts with two dedicated outdoor air systems that provdie outdoor air to the whole building.