NC-v4 INc1:Innovationposted by Norbert Szircsak on
Dear All,
The innovation strategy 1 under Innovation: Parksmart Measures looks a good fit for our project, and I think generally for many projects.
How can an expansion project with zero indoor water use scope comply with WEp2 requirement to reduce potable water use >20%?
Warehouses-NC-v4 WEp2:Indoor water use reductionposted by Blake Jackson on
I'm working on a 455,000gsf expansion of an existing warehouse/stroage facility.
Is string lighting exempt from the Light Trespass/Uplight requirements.
NC-v4 SSc6:Light pollution reductionposted by Summer Gorder on
Hi, we have a project where they are using string lighting to light a pathway.
Does type of signage matter?
CI-v4 EQp2:Environmental tobacco smoke controlposted by Edgar Arevalo on
Does it matter the type of signage that's displayed at the entries of the building? I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly
Diverse uses outside the project boundary/ tenant fitout area but within the same building
CI-v4 LTc2:Surrounding density and diverse usesposted by Ranya Metwalli Shields on
Our project is a retail tenant located within a mall.
Option 1 Path 2/3 - Natural Ventilation and DES
CS-v4 EAp2:Minimum energy performanceposted by Azra on
Hello,
we got a kind of an unusal situation here, at least for us.
Modeling indirectly conditioned spaces
NC-v4 EAp2:Minimum energy performanceposted by Gaston Michaud on
Hi all,
We are working in a CS project, and just got back the following comment from the LEED Reviewer:
Modeling Proposed DHW with Insulation
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am Modeling a DHW system and most of my savings are coming from Insulation in the heater tank, now the LEED reviewer said that the savings should be modeled with Exceptional Calculation MEthod
Can ID+C be selected for whole building?
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Leo LeQuoc on
Our team is working on a project of a whole 2-storey (to be) newly constructed office building.
Template?
CS-v4 SSc7:Tenant design and construction guidelinesposted by Erin Holdenried on
Is there a template available for this credit? Thanks!